13/05/2026
Kings Park works to clear blocked sewer line with significant tree root presence.
Expose sewer line using wet saw to cut concrete areas. Excavate and expose by hand.
Replace 100mm PVC inspection opening and make sound connection to VCP service.
Backfill all removed soil and clean site.
Prepare reinforcement steel and concrete.
-
-