Echidna Built

Echidna Built Echidna Built is a Modular Builder manufacturing custom designed, high quality structures

04/09/2026

Week two on the Paaratte and the pace hasn't dropped. Sparkies have their rough-in well under way, the plumbers have their roof specs sorted, and the windows are in. Cladding is up next.

This is the difference a factory build makes. No rain days, no rescheduling trades, no sitting idle. Just steady progress under one roof.

Follow along, there's plenty more to come as the Paaratte takes shape.

28/08/2026

Introducing the Paaratte, the newest home in the Echidna Built factory.

Right now it's a frame but over the coming weeks we'll show you every stage as it becomes a finished home, starting with this walk around and through the early build.

If you've ever wanted to see how a modular home actually gets built, this is the series to follow.

24/08/2026

Update number 6! Winchelsea, here they come.

Modules 1 and 2 left the factory this morning, Alistair and Andy seeing them off the floor and onto the truck.
Nunn Bros Haulage doing the heavy lifting again. They've carried plenty of Echidna Built homes and we wouldn't trust anyone else with it.
Next stop, site.

17/08/2026

Update number 5, and it's a big one!

The home has been split back into its modules, each one wrapped, braced and ready for the road. Everything done in the factory travels with it: plaster, windows, bathrooms, the lot.

That's the beauty of building this way. Nothing gets pulled apart and redone on site. The modules arrive, come together in a matter of days, and the home picks up right where the factory left off.

Next stop: the block. Moving day is nearly here, and we'll be bringing you along for it.

Follow along for update number 6, this is the one you won't want to miss.

07/08/2026

The Winchelsea Build: Part Four

The outside is done. Roof on, windows fitted throughout, and the building wrap fully installed.

Inside, the plaster is up and the bathrooms are starting to take shape. It's starting to feel like a real home rather than a work site.

Keep your eyes peeled. The big move is happening soon.

We're hiring: Construction Project Manager, Geelong, and the South West.Echidna Built builds modular homes at our Colac ...
02/08/2026

We're hiring: Construction Project Manager, Geelong, and the South West.

Echidna Built builds modular homes at our Colac factory and delivers them across the region. We need someone who can run the project side properly: keep installs moving, hold the standard,
and take clients from contract to keys without the drama.

You'd be working for a family business that builds things once and builds them right, backed by 50 years of the CMTP group behind it.

The full ad is on SEEK: https://www.seek.com.au/job/93642828

If this sounds like someone you know, send it their way.

Ready to own projects, not just manage them? Shape the future of modular construction with real autonomy & career growth with 50 years of stability!

Carpenter wanted. Colac.Echidna Built makes modular homes at our factory on Forest Street, and we're after another carpe...
31/07/2026

Carpenter wanted. Colac.

Echidna Built makes modular homes at our factory on Forest Street, and we're after another carpenter on the tools.

It's carpentry with a difference. Every home is built under a roof, to a standard you'd happily put your name on. No chasing jobs across the state, no rained-out days. You build proper homes start to finish, and you're home every night.

We're part of the CMTP family, a Colac business 50 years strong, so you're joining something solid.

Full details and how to apply are on SEEK: https://www.seek.com.au/job/93279011

Know a good chippy looking for a change? Tag them or share this post.

This isn't just another carpentry job. Help build the future of Australian homes with a team that's doing things differently - Echidna Built

17/07/2026

Spot the first hint of finished cladding? That's Spotted Gum, and it's our first proper look at the character this home will have when it's complete.
The roof is on and most of the insulation is now in. It's the work you'll never see once the walls close up, but it's what makes a home comfortable to live in for decades.
The Winchelsea Build is well on its way. Plenty more to share as the inside starts taking shape.

13/07/2026

WE'RE HIRING – Construction Project Manager

Echidna Built is growing, and we're looking for an experienced Construction Project Manager to help deliver premium modular building projects across Victoria.

Backed by CMTP's 50+ years of manufacturing excellence, Echidna Built is changing the way modular construction is delivered

Location: Colac, VIC

If you're ready to take ownership of exciting projects and join a business on the cusp of major growth, we'd love to hear from you.

Apply now via SEEK: https://au.seek.com/job/93278072

Know someone who'd be a great fit? Tag them below or share this post!

09/07/2026

It's been another productive week on site, with the exterior really starting to take shape.
The roof has now been installed, the windows are in place, and the entire home has been wrapped, giving us a great glimpse of the home's final form. It's always exciting to reach this stage of the build, where the vision starts becoming reality.
We're looking forward to sharing more progress as the Winchelsea Build continues to come together.

Address

92-100 Forest Street
Colac East, VIC
3250

Alerts

Be the first to know and let us send you an email when Echidna Built posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Echidna Built:

Shortcuts

Share