14/07/2022
I finished a bathroom today in Gawler on Cameron street, unfortunately I didn’t take before photos which would of showed how much work I’ve done, there was a corner spa where the toilet is and the floor level was all wrong. I removed the floor after Ben Edwards cut it up for me and replaced all the plumbing , floor was termite treated before new concrete was laid and a set down was created for right falls. A strip drain was installed from wall to wall. The tiler done a nice job as the walls were massively out of square being an old 100 year stone home , he plastered the walls to straighten up and squared up also, screeded, waterproofed , grouted and siliconed. Owner’s have nice taste in picking fittings from Reece and very good quality. Still a heated towel rail to go in and shower glass panel which was measured today .Dan Dan Ricardo thanks for the electrical and fixing some of the existing dodgie wiring which now is compliant. I’m very pleased on how this bathroom has come out and customers are happy to have there house back and start cleaning up all the dust 😁