17/08/2026
It might not look pretty tucked under the frame, but this is a tried-and-true modified solution that saved our client big time!
Instead of chopping out the entire floor, we retrofitted a 30mm wet area drop for this setup. It was a very cost-effective fix that kept the build moving and passed the certifier with flying colours.
By coordinating closely with the plumber on-site, we backfilled the void, sealed the pe*******on and integrated our termite protection cleanly around the pipe and timber frame—leaving zero entry points for pests and zero headaches for the build.
This area is to receive a 30mm structural grout bed before waterproofing and tiling.
Why Great Site Coordination Wins:
1. Cost-Effective: Smart workarounds that save your budget without cutting corners.
2. Certifier Approved: Done strictly to standard for a hassle-free sign-off.
3. Complete Protection: Termite barriers integrated seamlessly into complex pe*******on setups.
When trades work together, the owner-builder wins every time! 🛠️