21/09/2026
For awhile there Starbuck excavation was running at 90 percent. Everything in this game is designed to slow you down. It’s really hard to get things running like clockwork.
Machines, floats, traffic, labour, plans, designs, builders engineers. You name it, everything stops dirt going out the gate.
The last month or two we have been nailing it. This job started Saturday and is finished today. Over a thousand cube smashed out. This is just one of many jobs that is showing exactly what we do when we flying. Thanks to everyone from the allocators and labourers to the managers and operators. Appreciate every single one of you.
This one done by our main man Max Christopher there’s not much better on the sticks than him. If you’re looking for a job cranking some dirt out send me a DM.