Smit excavations

Call Contact the business

Smit excavations Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Smit excavations, Demolition & excavation company, Park Orchards.

New 100mm GP bucket ready to go!Why pay by the hour for a 1.7-tonne excavator running a 350mm bucket to trench for your ...
30/10/2026

New 100mm GP bucket ready to go!

Why pay by the hour for a 1.7-tonne excavator running a 350mm bucket to trench for your 20mm conduit, 32mm water pipe, gas lines and 100mm agi pipe?

When you could get the job done faster and more efficiently with Smit Excavations.

The right machine, the right bucket and the right equipment for the job means less time trenching and more time keeping your project moving.

Don’t let trenching hold up your next project. Get Smit Excavations on the job!

📞 Get in touch today for a quote.
0402 768 000

Asphalt driveway done and dusted, 150 square meters.Started by ripping up concrete driveway,Dumping 30m3 of clean fill t...
23/10/2026

Asphalt driveway done and dusted, 150 square meters.
Started by ripping up concrete driveway,
Dumping 30m3 of clean fill to level it out,
Crushed rock and asphalting completed by Flex23 Asphalting
All completed in 3 days!

Stage 2 of Park orchards rock work and sawn basalt steppers completed back in August!
20/10/2026

Stage 2 of Park orchards rock work and sawn basalt steppers completed back in August!

Driveway ripped up for Boronia project🤏30 cubic meters of fill dumped in driveway to level her out,Smudge bar on the 1.7...
19/10/2026

Driveway ripped up for Boronia project🤏
30 cubic meters of fill dumped in driveway to level her out,
Smudge bar on the 1.7 is doing work!!!
Asphalt for Friday!

Past 2 days at a property in Park orchards, total of 260 cubic meters was used in building up a pad for a flat area for ...
17/10/2026

Past 2 days at a property in Park orchards, total of 260 cubic meters was used in building up a pad for a flat area for useable space, embarked to be planted out and mulched, pad top soiled at a later date.

Vegetation and landscape prep package for this property in Ringwood north,Works consisted of,Trimming up 9m3 of soil int...
11/10/2026

Vegetation and landscape prep package for this property in Ringwood north,
Works consisted of,
Trimming up 9m3 of soil into the bin
30m3 of green waste removal
And finishing it off with removing concrete pavers,

Already for landscaping package in the future.

Day at Research project.Lot done in a day, works consisting of-Cut for concrete -rubbish removal -Spread crushed rock-Ba...
26/09/2026

Day at Research project.
Lot done in a day, works consisting of
-Cut for concrete
-rubbish removal
-Spread crushed rock
-Back fill retaining walls
-Bulked out a total of 20m3
Thanks to JDS Earthmoving Group on the posi and tipper for the chop out!

Sunday shift,Retaining wall replacement in Keysbourgh!
20/09/2026

Sunday shift,
Retaining wall replacement in Keysbourgh!

Progress post for Park orchards basketball court project,32 paver steppers! Project coming to completion, much more work...
18/09/2026

Progress post for Park orchards basketball court project,
32 paver steppers! Project coming to completion, much more work for this property in the future.

Address

Park Orchards, VIC
3114

Telephone

+61402768000

Website

Alerts

Be the first to know and let us send you an email when Smit excavations posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Smit excavations:

Shortcuts

Share