05/03/2026
Stage 1 Completed
Over two weekends, this 700+ m² car park in the Perth CBD was completely transformed. A heavy-duty, three-coat MMA quartz system was installed, delivering a highly durable and hard-wearing surface designed to withstand constant vehicle traffic.
Thanks to our fast-curing system, the facility was ready to reopen by Monday morning, with areas able to return to operation just two hours after the final topcoat application.
Fast back to business. Strong. Durable. Built to last.