13/12/2025
We recently completed a backup generator installation for .
A 17kVA generator with an automatic transfer switch was installed to maintain supply during outages.
The project was delivered as a full turnkey solution, including generator supply and installation, crane truck logistics and concrete slab construction.
All shutdown works were completed outside of practice hours to avoid disruption to the clinic.