03/06/2026
We were called back to Bossley Park to finish off the job β and this one had a few extra steps before a single plank could go down. πͺ
The customer had already ripped out the old carpet, but the concrete subfloor was sitting 10mm lower than the tiled hallway. So before anything else, we poured self-levelling compound across both bedrooms to bring everything up flush. Once that was set and solid, we glued down a 5mm acoustic rubber underlay across the entire area to give the floor that extra cushion and sound deadening.
Then came the good part β 12mm Pantora Laminate in Blackbutt throughout both bedrooms and the hallway. That Blackbutt colour is warm, natural and works with everything. The customer was stoked with the result, and honestly it's hard not to be. π
Two days, two bedrooms, one hallway β all done properly.