28/10/2026
Duke Ponds and Spring Gully.
CTC supplied two 623 scrapers and a D9T for the rehab on multiple ponds on the Origin Energy Spring Gully and Duke ponds sites for FKG during 2023.
With GPS Guidance the D9 bulldozer was a nimble and efficient machine for short shift material. and with a multi shank rippers it kept the scrapers feed with easy loading material.