PART 2
This one had a new barge fuse and RCBOs, but the rusted, broken meter box, asbestos panel and undersized consumer mains still needed sorting.
New point of attachment and barge fuse bracket with a future three-phase upgrade in mind, new 16mm² XLPE consumer mains protected in HD conduit the whole way, and a brand new meter box recessed into the wall.
Finished off with a new 6mm² main earth, earth stake, all new service equipment and Hager RCBOs for the sub-circuits.
Good to get the whole lot sorted properly 👌