13/05/2026
The installation work at Bangladesh University of Professionals (BUP) West Campus has now been successfully completed, delivering a large-scale outdoor project spanning 84,000 sqft.
The project included Khadim Ceramic Klinker Paver (8''Ã4''Ã2'') installation across walls, walkways, stairs, and the amphitheatre. One of the key challenges was managing open-area leveling along with an efficient rainwater drainage system. Careful slope design and lake-oriented drainage planning ensured smooth water flow toward the lake between the East and West campuses.
With precise ex*****on and coordinated effort, the project has been completed to ensure durability, functionality, and long-term performance.