13/01/2026
A significant portion of delays and cost overruns in construction begins before any physical work starts, usually due to fragmented drawings, late design changes, coordination gaps, and limited visibility into scheduling, quantities, and lifecycle data.
3D to 7D BIM addresses these challenges by aligning design, sequencing, quantities, cost, sustainability, and facility management data into one coordinated environment, supporting ISO19650-aligned workflows and digital handover requirements across Japan and Europe.
Penta Engineering supports general contractors, architects, design offices, and asset owners by:
• Detecting and resolving clashes before tender and construction
• Connecting design models with 4D scheduling and site sequences
• Improving tender accuracy through early quantities and cost insight
• Delivering structured COBie/FM handover data for long-term operations
The carousel explains how these BIM workflows reduce rework, compress timelines, improve margins, and strengthen lifecycle performance across complex AEC projects. If your teams are transitioning from drawing-based coordination to model-based delivery, the next slides provide practical clarity on processes, standards, tools, and ROI.