XERO FIRM

XERO FIRM Architecture,Interior,Landscaping,Stucture.

On going ProjectCommon bedroom.Site location-BashundharaSite Area-4530 sftWe really concern about your building and also...
27/02/2026

On going Project
Common bedroom.
Site location-Bashundhara
Site Area-4530 sft

We really concern about your building and also your Modern thinking.
We are trying to organise your home in a modern way.
We are trying to establish your vision.

Slab Rebar Checklist1. Drawings & SpecsStructural drawing approved and latest revisionBar size, spacing, and type as per...
07/02/2026

Slab Rebar Checklist

1. Drawings & Specs

Structural drawing approved and latest revision

Bar size, spacing, and type as per drawing

Slab thickness confirmed

2. Rebar Material

Correct bar diameter (e.g., 8mm, 10mm, 12mm)

Bars free from rust, oil, mud, paint

Proper bending shape and length

3. Placement

Main bars placed in correct direction

Distribution bars placed perpendicular

Spacing maintained as per drawing

Extra bars provided at:

Supports

Openings (ducts, pipes)

Cantilever areas

4. Cover & Support

Clear cover maintained (usually 15–25 mm for slab)

Cover blocks of correct thickness used

Cover blocks properly spaced

Chairs / spacers provided for double-layer reinforcement

5. Lapping & Anchorage

Lap length as per code/drawing

Laps staggered (not all in one line)

Laps not placed in maximum moment zone

Proper anchorage at beams and edges

6. Tying & Stability

Bars tied properly with binding wire

No loose or displaced bars

Reinforcement stable for concreting work

7. Openings & Embedded Items

Electrical conduits fixed and tied

Sleeves and openings reinforced

No cutting of main bars without approval

8. Final Checks Before Concreting

Rebar cleaned

Level and alignment checked

Engineer/consultant inspection completed

Approval given for concrete pour

Footing Layout Check   Storid Building
05/02/2026

Footing Layout Check
Storid Building

Site reconstruction
04/02/2026

Site reconstruction

Slab Shuttering Checklist (Before Concreting)Shuttering material clean, undamaged, and properly oiledSlab level, thickne...
03/02/2026

Slab Shuttering Checklist (Before Concreting)

Shuttering material clean, undamaged, and properly oiled
Slab level, thickness, and dimensions as per drawing
Proper supports/props spacing and tightness
No gaps or leakage points in shuttering
Beam–slab junction properly sealed
Camber provided where required
Electrical conduits and sleeves fixedReinforcement checked & cover blocks in placeShuttering strong enough to take concrete load
Safety supports and access in place

02/02/2026

Slab Casting completed

Duplex building
01/02/2026

Duplex building


Interior SiteFalse Ceiling Work Hotel Room
30/01/2026

Interior Site
False Ceiling Work
Hotel Room

Spiral Stair 🏗️
29/01/2026

Spiral Stair 🏗️

Cabinet
27/01/2026

Cabinet

27/01/2026

Address

Banasree A Block, Road No-5/1, House No-01
Dhaka
1219

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Saturday 09:00 - 17:00
Sunday 09:00 - 17:00

Website

Alerts

Be the first to know and let us send you an email when XERO FIRM posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share