09/08/2026
🔨 Project Progress Update — Forge Construction & Contracting
More great progress on our studio build!
We’ve taken this project from the ground up, starting with site preparation and the pier foundation, then moving into the beam and floor system, subfloor, wall framing, and exterior sheathing.
The structure is really starting to take shape now. The walls are up, window and door openings are framed, and the single-slope roofline is coming together nicely.
A lot of work goes into getting to this stage—making sure everything is level, square, properly supported, and built solid from the foundation up. It’s great seeing the transformation with each step.
Next up: roof framing, completing the exterior envelope, windows and doors, and getting this building dried in.
Big thanks to the crew for putting in the work and keeping things moving. More progress photos coming soon!
Forge Construction & Contracting
Built from the ground up. Built to last.