04/13/2025
Here's the rest of the reno from the bathroom I posted. I was at this house for about a month and a half doing a full reno in the main level. The customers were pretty happy with the work completed. We installed the floors, framed, drywalled and installed the tile on the custom fireplace, installed baseboard and trim, sprayed the kitchen cabinets, tiled the backsplash, built the range hood cover, and added shelves, also did all the custom work in bathroom they had gutted. Alot of prep work went into this one. By far one of my favorite completed renos.