Blower Door Test Results 💨🏠This carrige house build was designed to meet Step 3… and we tested at:✅ 1.402 ACH50✅ 50.2 Pa...
02/26/2026

Blower Door Test Results 💨🏠

This carrige house build was designed to meet Step 3… and we tested at:

✅ 1.402 ACH50
✅ 50.2 Pa target pressure
✅ 266 m³ volume

So what does that actually mean?

A blower door test measures how airtight your home is. The lower the ACH (air changes per hour), the less uncontrolled air leaks in and out of the building.

Why that matters:

• Lower heating bills
• More consistent indoor temperatures
• Less drafts
• Better moisture control
• Longer building lifespan
• Higher overall build quality

At 1.4 ACH50, this home is performing well beyond a typical Step 3 target and pushing toward Step 4-level airtightness. And once we get finished drywall installed that should bring us to that 1.0 ACH50 mark! That doesn’t happen by accident — it’s attention to detail at every stage:

✔️ Sealed penetrations
✔️ Properly detailed air barrier
✔️ Tight top and bottom plates
✔️ Clean window installs

A tight house isn’t just about passing inspection — it’s about building smarter, more efficient homes that perform long term.

Performance matters. Quality shows

Cedar shingled gable for texture and depth, paired with a custom gable vent to keep the air flow right while staying tru...
02/12/2026

Cedar shingled gable for texture and depth, paired with a custom gable vent to keep the air flow right while staying true to the look. Functional, durable and built to age beautifully on the coast🌲🏠

Give us a call to book your next project!

Finnished (for now) shop space we built out in sharpes bay
12/28/2025

Finnished (for now) shop space we built out in sharpes bay

Photo dump of the last few months! All done at the nation project and have started a cool build out in sharpes bay! The ...
11/23/2025

Photo dump of the last few months! All done at the nation project and have started a cool build out in sharpes bay! The boys are killing it👌🏻

Day and a half for walls/sheathing and trusses today🤟🏻 Rolling along nicely at the nation project, overhangs and roof sh...
08/23/2025

Day and a half for walls/sheathing and trusses today🤟🏻

Rolling along nicely at the nation project, overhangs and roof sheathing starting monday then onto the next one!
Initio Contracting Ltd.

Carrige house progress! Roof going on soon then doors and siding!
05/16/2025

Carrige house progress! Roof going on soon then doors and siding!

🔨 Now Hiring: Skilled Carpenter – Join Kingpost Construction! 🔨Kingpost Construction is looking for a skilled and reliab...
03/24/2025

🔨 Now Hiring: Skilled Carpenter – Join Kingpost Construction! 🔨

Kingpost Construction is looking for a skilled and reliable carpenter to join our growing team! If you take pride in quality craftsmanship and want to work on exciting projects, we want to hear from you!

What We’re Looking For:

✔️ Experience in framing, trim work, and general carpentry
✔️ Ability to read blueprints and follow project plans
✔️ Own basic hand tools (power tools a plus)
✔️ Strong work ethic and attention to detail
✔️ Ability to work independently and as part of a team
✔️ Valid driver’s license and reliable transportation

If you’re ready to build something great with us, send your resume or work experience details to [email protected] or call us at 604-223-6202

Join Kingpost Construction and be part of a team that values craftsmanship and quality!

November-about a week ago. Boys are rolling along nicely on the condos. Another couple weeks and we will have around 850...
03/12/2024

November-about a week ago. Boys are rolling along nicely on the condos. Another couple weeks and we will have around 850 feet of wrap around deck completed, built out of beautiful glulam post and beams. Will be full force on building wrap and window install soon!

Haven’t been on here in a while! Here’s a preview of that last couple months. Getting close to seeing walls up on the se...
08/04/2023

Haven’t been on here in a while! Here’s a preview of that last couple months. Getting close to seeing walls up on the second floor!

Address

Powell River, BC

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 4pm

Telephone

+6042236202

Alerts

Be the first to know and let us send you an email when Kingpost Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share