KeyDraft Designs

Call Website Contact the business

KeyDraft Designs Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from KeyDraft Designs, Architectural Designer, 38 SEDGEWICK Circle, Toronto, ON.

08/30/2026

Below-grade entrance framing requires coordinated design, structural support, and permit compliance under OBC 2024.

A compliant installation should address:
โœ“ Structural opening dimensions, lintels, beams, and temporary or permanent support
โœ“ Stair geometry, guards, handrails, landings, and safe access
โœ“ Drainage, grading, waterproofing, and foundation-wall interfaces
โœ“ Door and window requirements where applicable, including operation and protection
โœ“ Fire separation and egress considerations for basement living areas or dwelling units
โœ“ Required inspections before work is concealed
โœ“ Construction alignment with the approved architectural and engineering drawings

The framing, entrance details, and site work should be coordinated before construction proceeds. Clear permit documentation helps support accurate inspections and compliant ex*****on.

Planning a below-grade entrance in Toronto, Brampton, Mississauga, Milton, Kingston, or anywhere in Ontario? DM โ€œCODEโ€.

KeyDraft Designs serves all over Ontario.
4372258713 | [email protected]

KeyDraft Designs completed the architectural design, MEP engineering drawings, and commercial permit coordination for th...
08/21/2026

KeyDraft Designs completed the architectural design, MEP engineering drawings, and commercial permit coordination for this Ocean Basket Fish & Chips restaurant project in Kingston, Ontario.

Project scope:
โœ“ Architectural design and layout planning
โœ“ Mechanical, electrical, and plumbing (MEP) drawings
โœ“ Commercial permit coordination and approval
โœ“ Planning for kitchen operations and customer circulation

Planning a restaurant, retail unit, or commercial renovation? Comment โ€œCOMMERCIALโ€ for professional design and permit guidance.

Serving all over Ontario.

Phone: 4372258713
Email: [email protected]

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฆ๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐Ÿต.๐Ÿญ๐Ÿฌ.๐Ÿญ๐Ÿต ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€Compliance with the 2024 Ontario Building Code (OBC) is essential fo...
08/01/2026

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฆ๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐Ÿต.๐Ÿญ๐Ÿฌ.๐Ÿญ๐Ÿต ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€

Compliance with the 2024 Ontario Building Code (OBC) is essential for legal second suite conversions. Section 9.10.19 dictates specific life-safety standards for smoke and carbon monoxide alarms to ensure occupant safety across multi-unit dwellings.

๐—ž๐—ฒ๐˜† ๐—ฆ๐—ฝ๐—ฒ๐—ฐ๐—ถ๐—ณ๐—ถ๐—ฐ๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€:
- ๐—›๐—ฎ๐—ฟ๐—ฑ๐˜„๐—ถ๐—ฟ๐—ฒ๐—ฑ ๐—–๐—ผ๐—ป๐—ป๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป: Alarms must be hardwired to an electrical panel and equipped with battery backup.
- ๐—œ๐—ป๐˜๐—ฒ๐—ฟ๐—ฐ๐—ผ๐—ป๐—ป๐—ฒ๐—ฐ๐˜๐—ถ๐˜ƒ๐—ถ๐˜๐˜†: All alarms must be interconnected so that if one triggers, all sound simultaneously.
- ๐—ฃ๐—น๐—ฎ๐—ฐ๐—ฒ๐—บ๐—ฒ๐—ป๐˜ ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ๐˜€: Alarms must be ceiling-mounted within 5m of any bedroom and within 15m of any point on every storey.
- ๐—–๐—ผ๐—บ๐—ฝ๐—น๐—ถ๐—ฎ๐—ป๐—ฐ๐—ฒ ๐—”๐—น๐˜๐—ฒ๐—ฟ๐—ป๐—ฎ๐˜๐—ถ๐˜ƒ๐—ฒ ๐—–๐Ÿญ๐Ÿณ๐Ÿฎ: Allows for battery-operated units only if AC power was not otherwise required for the space.
- ๐—–๐—ข ๐——๐—ฒ๐˜๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป: Hardwired, interconnected Carbon Monoxide detectors are mandatory where fuel-burning appliances or attached garages are present.

KeyDraft Designs provides technical precision for projects in Milton, Mississauga, Brampton, and all over Ontario. Serving all over Ontario.

DM "SMOKE" for expert guidance.

Phone: 4372258713
Email: [email protected]

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฆ๐˜๐—ฎ๐—ถ๐—ฟ, ๐—›๐—ฎ๐—ป๐—ฑ๐—ฟ๐—ฎ๐—ถ๐—น & ๐—š๐˜‚๐—ฎ๐—ฟ๐—ฑ๐—ฟ๐—ฎ๐—ถ๐—น ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€Compliance with Ontario Building Code 2024 (Sections 9.8...
07/31/2026

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฆ๐˜๐—ฎ๐—ถ๐—ฟ, ๐—›๐—ฎ๐—ป๐—ฑ๐—ฟ๐—ฎ๐—ถ๐—น & ๐—š๐˜‚๐—ฎ๐—ฟ๐—ฑ๐—ฟ๐—ฎ๐—ถ๐—น ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€

Compliance with Ontario Building Code 2024 (Sections 9.8.1 - 9.8.8) is essential for safety and permit approval. Here are the technical specifications for residential projects:

โ€ข ๐—ฆ๐˜๐—ฎ๐—ถ๐—ฟ ๐—ช๐—ถ๐—ฑ๐˜๐—ต: Minimum 860mm between stringers (900mm for exit stairs).
โ€ข ๐—›๐—ฒ๐—ฎ๐—ฑ๐—ฟ๐—ผ๐—ผ๐—บ: Minimum 1950mm clearance measured vertically from the nozzle line.
โ€ข ๐—–๐˜‚๐—ฟ๐˜ƒ๐—ฒ๐—ฑ ๐—ฆ๐˜๐—ฎ๐—ถ๐—ฟ๐˜€: Minimum average run of 200mm. Spiral stairs are not permitted in new construction.
โ€ข ๐—›๐—ฎ๐—ป๐—ฑ๐—ฟ๐—ฎ๐—ถ๐—น๐˜€: Required for stairs with more than 2 risers. Height must be between 800mm and 965mm.
โ€ข ๐—š๐˜‚๐—ฎ๐—ฟ๐—ฑ๐—ฟ๐—ฎ๐—ถ๐—น๐˜€: Minimum 900mm height for interior and 1070mm for exterior.
โ€ข ๐—ฃ๐—ถ๐—ฐ๐—ธ๐—ฒ๐˜ ๐—ฆ๐—ฝ๐—ฎ๐—ฐ๐—ถ๐—ป๐—ด: Maximum 100mm to prevent passage.

For renovations involving existing structures, compliance alternatives C107, C108, C111, and C112 provide specific exemptions for stairs and guards.

KeyDraft Designs provides expert architectural services in Milton, Mississauga, and Brampton. Serving all over Ontario.

DM "STAIRS" to discuss your next project.
Phone: 4372258713
Email: [email protected]

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฆ๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐Ÿต.๐Ÿฑ.๐Ÿฐ ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€Compliance with the 2024 Ontario Building Code is essential for the de...
07/30/2026

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฆ๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐Ÿต.๐Ÿฑ.๐Ÿฐ ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€

Compliance with the 2024 Ontario Building Code is essential for the design and permitting of second suites. Section 9.5.4 outlines specific minimum area standards that must be met to ensure architectural precision and regulatory approval.

๐—ž๐—ฒ๐˜† ๐—ฆ๐—ฝ๐—ฒ๐—ฐ๐—ถ๐—ณ๐—ถ๐—ฐ๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€ ๐—ณ๐—ผ๐—ฟ ๐—ฆ๐—ฒ๐—ฐ๐—ผ๐—ป๐—ฑ ๐—ฆ๐˜‚๐—ถ๐˜๐—ฒ๐˜€:
โ€ข Living Space (2+ Bedrooms): 13.5mยฒ min.
โ€ข Living Space (1 Bedroom): 11.0mยฒ min.
โ€ข Dining Space: 3.25mยฒ (combined) or 7.0mยฒ (separate).
โ€ข Kitchen (2+ Bedrooms): 4.2mยฒ min.
โ€ข Master Bedroom: 6.0mยฒ (with closets) or 7.0mยฒ (without closets).
โ€ข Secondary Bedroom: 8.8mยฒ (with closets).

Additionally, most municipal zoning bylaws in cities like Milton, Mississauga, and Brampton require a total minimum suite area of 37mยฒ.

KeyDraft Designs provides expert architectural drafting and engineering services to ensure your project is compliant from start to stamp. We serve clients in Milton, Mississauga, Brampton, and all over Ontario.

DM "ROOMS" for professional guidance on your next project.

๐Ÿ“ž 4372258713
๐Ÿ“ง [email protected]

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—™๐—ถ๐—ฟ๐—ฒ ๐—ฆ๐—ฒ๐—ฝ๐—ฎ๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ฏ๐—ฒ๐˜๐˜„๐—ฒ๐—ฒ๐—ป ๐—ฆ๐˜‚๐—ถ๐˜๐—ฒ๐˜€Section 9.10.9.14 of the Ontario Building Code outlines the techni...
07/29/2026

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—™๐—ถ๐—ฟ๐—ฒ ๐—ฆ๐—ฒ๐—ฝ๐—ฎ๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ฏ๐—ฒ๐˜๐˜„๐—ฒ๐—ฒ๐—ป ๐—ฆ๐˜‚๐—ถ๐˜๐—ฒ๐˜€

Section 9.10.9.14 of the Ontario Building Code outlines the technical requirements for fire separations to ensure safety and compliance in multi-family dwellings. Precision in these specifications is essential for permit approval and structural integrity.

๐—ž๐—ฒ๐˜† ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€:
โ€ข A 45-minute fire-resistance rating is mandatory between dwelling suites.
โ€ข A 1-hour fire-resistance rating applies if either suite occupies more than one storey.
โ€ข ๐—–๐—ผ๐—บ๐—ฝ๐—น๐—ถ๐—ฎ๐—ป๐—ฐ๐—ฒ ๐—”๐—น๐˜๐—ฒ๐—ฟ๐—ป๐—ฎ๐˜๐—ถ๐˜ƒ๐—ฒ ๐—–๐Ÿญ๐Ÿฐ๐Ÿต permits a reduction to a 30-minute rating under specific conditions.

๐—ข๐—ฝ๐˜๐—ถ๐—บ๐—ถ๐˜‡๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐˜ƒ๐—ถ๐—ฎ ๐—ฆ๐—บ๐—ผ๐—ธ๐—ฒ ๐—”๐—น๐—ฎ๐—ฟ๐—บ๐˜€:
โ€ข Horizontal separations can be reduced to 15 minutes when interconnected hardwired smoke alarms are installed.
โ€ข Vertical separations can be waived with the implementation of these smoke alarms.

At KeyDraft Designs, we provide expert architectural guidance to navigate ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ standards flawlessly. Whether you are developing in ๐— ๐—ถ๐—น๐˜๐—ผ๐—ป, ๐— ๐—ถ๐˜€๐˜€๐—ถ๐˜€๐˜€๐—ฎ๐˜‚๐—ด๐—ฎ, or ๐—•๐—ฟ๐—ฎ๐—บ๐—ฝ๐˜๐—ผ๐—ป, we ensure your project is compliant and professional. Serving all over Ontario.

DM "FIRESEP" to discuss your project.

Phone: 4372258713
Email: [email protected]

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฅ๐—ผ๐—ผ๐—บ ๐—›๐—ฒ๐—ถ๐—ด๐—ต๐˜ ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ๐˜€ ๐—ณ๐—ผ๐—ฟ ๐—ฆ๐—ฒ๐—ฐ๐—ผ๐—ป๐—ฑ ๐—ฆ๐˜‚๐—ถ๐˜๐—ฒ๐˜€Section 9.5.3.1 of the ๐—ข๐—ป๐˜๐—ฎ๐—ฟ๐—ถ๐—ผ ๐—•๐˜‚๐—ถ๐—น๐—ฑ๐—ถ๐—ป๐—ด ๐—–๐—ผ๐—ฑ๐—ฒ ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ outline...
07/28/2026

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฅ๐—ผ๐—ผ๐—บ ๐—›๐—ฒ๐—ถ๐—ด๐—ต๐˜ ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ๐˜€ ๐—ณ๐—ผ๐—ฟ ๐—ฆ๐—ฒ๐—ฐ๐—ผ๐—ป๐—ฑ ๐—ฆ๐˜‚๐—ถ๐˜๐—ฒ๐˜€

Section 9.5.3.1 of the ๐—ข๐—ป๐˜๐—ฎ๐—ฟ๐—ถ๐—ผ ๐—•๐˜‚๐—ถ๐—น๐—ฑ๐—ถ๐—ป๐—ด ๐—–๐—ผ๐—ฑ๐—ฒ ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ outlines specific ceiling height requirements for legal second dwellings. For projects in Milton, Mississauga, Brampton, and throughout Ontario, adherence to these technical specifications is essential for compliance and permit approval.

๐—ž๐—ฒ๐˜† ๐—›๐—ฒ๐—ถ๐—ด๐—ต๐˜ ๐—ฆ๐—ฝ๐—ฒ๐—ฐ๐—ถ๐—ณ๐—ถ๐—ฐ๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€:

โ€ข ๐—Ÿ๐—ถ๐˜ƒ๐—ถ๐—ป๐—ด/๐——๐—ถ๐—ป๐—ถ๐—ป๐—ด/๐—ž๐—ถ๐˜๐—ฐ๐—ต๐—ฒ๐—ป: Minimum 2300mm over at least 75% of the required floor area.
โ€ข ๐—•๐—ฒ๐—ฑ๐—ฟ๐—ผ๐—ผ๐—บ๐˜€: Minimum 2300mm over at least 50% of the required floor area.
โ€ข ๐—•๐—ฎ๐˜๐—ต๐—ฟ๐—ผ๐—ผ๐—บ๐˜€/๐—Ÿ๐—ฎ๐˜‚๐—ป๐—ฑ๐—ฟ๐˜†: Minimum 2100mm throughout the functional area.
โ€ข ๐—›๐—ฎ๐—น๐—น๐˜„๐—ฎ๐˜†๐˜€: Minimum 2100mm.

๐—–๐—ผ๐—บ๐—ฝ๐—น๐—ถ๐—ฎ๐—ป๐—ฐ๐—ฒ ๐—”๐—น๐˜๐—ฒ๐—ฟ๐—ป๐—ฎ๐˜๐—ถ๐˜ƒ๐—ฒ ๐—–๐Ÿต๐Ÿด:
When renovating existing spaces, OBC 2024 provides compliance alternative C98, allowing a reduced minimum height of 1950mm under specific conditions, such as under beams or ductwork.

KeyDraft Designs provides expert architectural drafting and engineering services ensuring your design meets all 2024 standards. We serve clients all over Ontario with technical precision.

DM "SUITE" to discuss your project.

Phone: 4372258713
Email: [email protected]

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ง๐—ฒ๐—บ๐—ฝ๐—ฒ๐—ฟ๐—ฒ๐—ฑ ๐—š๐—น๐—ฎ๐˜€๐˜€ ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€ (๐—ฆ๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—–๐Ÿญ๐Ÿด๐Ÿฌ)Is your entrance door a safety hazard? The ๐—ข๐—•๐—– rules o...
07/27/2026

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ง๐—ฒ๐—บ๐—ฝ๐—ฒ๐—ฟ๐—ฒ๐—ฑ ๐—š๐—น๐—ฎ๐˜€๐˜€ ๐—ฅ๐—ฒ๐—พ๐˜‚๐—ถ๐—ฟ๐—ฒ๐—บ๐—ฒ๐—ป๐˜๐˜€ (๐—ฆ๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—–๐Ÿญ๐Ÿด๐Ÿฌ)

Is your entrance door a safety hazard? The ๐—ข๐—•๐—– rules on glass specifications are precise regarding residential safety and occupant protection.

Under the ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ๐˜€, standard glass is prohibited in sidelights or entrance doors that could be mistaken for clear passage. Technical requirements include:

โœ” ๐—ฆ๐—ฎ๐—ณ๐—ฒ๐˜๐˜†-๐—ง๐˜†๐—ฝ๐—ฒ ๐—š๐—น๐—ฎ๐˜€๐˜€: Mandatory use of tempered or laminated safety glass for all entrance assemblies.
โœ” ๐—ฃ๐—ฒ๐—ฟ๐—บ๐—ฎ๐—ป๐—ฒ๐—ป๐˜ ๐—œ๐—ฑ๐—ฒ๐—ป๐˜๐—ถ๐—ณ๐—ถ๐—ฐ๐—ฎ๐˜๐—ถ๐—ผ๐—ป: Every pane must be visibly marked to confirm its safety rating.
โœ” ๐—–๐Ÿญ๐Ÿด๐Ÿฌ ๐—–๐—ผ๐—บ๐—ฝ๐—น๐—ถ๐—ฎ๐—ป๐—ฐ๐—ฒ: Ensuring structural integrity and impact resistance.

Ensuring these specifications are clear on your architectural drawings prevents inspection failures and ensures project accuracy. At ๐—ž๐—ฒ๐˜†๐——๐—ฟ๐—ฎ๐—ณ๐˜ ๐——๐—ฒ๐˜€๐—ถ๐—ด๐—ป๐˜€, we provide technical precision to ensure every project is compliant from start to stamp.

Serving all over ๐—ข๐—ป๐˜๐—ฎ๐—ฟ๐—ถ๐—ผ.

DM "CODE" to ensure your entry is compliant.

๐Ÿ“ž ๐Ÿฐ๐Ÿฏ๐Ÿณ๐Ÿฎ๐Ÿฎ๐Ÿฑ๐Ÿด๐Ÿณ๐Ÿญ๐Ÿฏ
๐Ÿ“ง ๐—ฐ๐—ผ๐—ป๐˜๐—ฎ๐—ฐ๐˜@๐—ธ๐—ฒ๐˜†๐—ฑ๐—ฟ๐—ฎ๐—ณ๐˜๐—ฑ๐—ฒ๐˜€๐—ถ๐—ด๐—ป๐˜€.๐—ฐ๐—ผ๐—บ

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฆ๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น ๐—”๐—น๐˜๐—ฒ๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€Opening up your floor plan? Your structural integrity depends on more than...
07/25/2026

๐—จ๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜€๐˜๐—ฎ๐—ป๐—ฑ๐—ถ๐—ป๐—ด ๐—ข๐—•๐—– ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฐ: ๐—ฆ๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น ๐—”๐—น๐˜๐—ฒ๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป๐˜€

Opening up your floor plan? Your structural integrity depends on more than just a beam.

Removing a wall without a structural assessment can lead to floor sagging or roof failure, often causing significant permit delays. Under OBC 2024 Part 9/11, any structural alteration to floors or walls must be assessed and stamped by a Professional Engineer (reference C145).

KeyDraft Designs provides technical precision and code-compliant solutions for:
โœ… Load-bearing wall removal specifications
โœ… Engineered beam and column design
โœ… Structural integrity assessments
โœ… Permit drawings and engineering stamps

Our approach ensures your project meets the latest 2024 standards while maintaining the aesthetic flow of your space. We provide the technical accuracy required for a flawless approval process.

Serving all over Ontario.

DM "CODE" for a structural consultation.

๐Ÿ“ž 4372258713
๐Ÿ“ง [email protected]

Address

38 SEDGEWICK Circle
Toronto, ON
L7A2P7

Alerts

Be the first to know and let us send you an email when KeyDraft Designs posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to KeyDraft Designs:

Shortcuts

Share