Abingdon All Aspects Building

Call Website Contact the business

Abingdon All Aspects Building Property refurbishment, loft & garage conversions, extensions and all aspects of roofing & building.

02/10/2026

Happy Friday 👊 Coming to the end of this one now 🔨
37m² of engineered oak fitted upstairs across multiple rooms and cupboards, plus this tricky 14-step winder staircase.
Just the last riser and nosing to fit, then it’s final snagging, gap filling and a tidy-up to get everything finished off properly.
Nearly there now 👊

A look back at this full roof build from 2023 🔨 I took this one on from the wall plate up, building the roof structure a...
30/09/2026

A look back at this full roof build from 2023 🔨 I took this one on from the wall plate up, building the roof structure and forming three rooflight openings before creating the falls to the front into the box gutter. From there I completed the full warm-roof build-up with the plywood deck, vapour control layer, insulation and OSB deck, followed by the GRP trims, matting and finished GRP roof. I also completed the leadwork and fitted the rooflights. These photos give a good example of a full warm-roof build-up, from the roof structure and falls through to the insulation, decking and finished GRP system. I didn’t get any photos of the final roof with the rooflights fitted as we were flat out at the time. Abingdon All Aspects Building — Roofing • Carpentry • Building work • Oxfordshire

I offer all aspects of roofing work. Get in touch today to arrange a free quote.
29/03/2023

I offer all aspects of roofing work. Get in touch today to arrange a free quote.

A testimonial from one of my satisfied customers
29/03/2023

A testimonial from one of my satisfied customers

Swipe left to check out one part of a first-floor refurbishment I have recently completed. Made good from floor to ceili...
18/02/2023

Swipe left to check out one part of a first-floor refurbishment I have recently completed. Made good from floor to ceiling.

A little sneak peak of 35m2 parquet flooring I am working on 👀
08/11/2022

A little sneak peak of 35m2 parquet flooring I am working on 👀

My most recent bedroom conversion.
07/11/2022

My most recent bedroom conversion.

Cladded dormer, re-bedded ridges, valley and verge before and after.
07/11/2022

Cladded dormer, re-bedded ridges, valley and verge before and after.

Address

Abingdon

Alerts

Be the first to know and let us send you an email when Abingdon All Aspects Building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Abingdon All Aspects Building:

Share