Pyrodem Ltd

Pyrodem Ltd Specialist pyrotechnic and low impact blasting. Royex rock breaking system sales and training
mining supplies
Blasting supplies

With over 2 decades of experience in the construction industry, we understand the importance of a fast, safe and reliable solution to rock breaking. Based in central Scotland, we can attend your site at reasonably short notice to carry out feasibility studies, blast, train and demonstrate the power, safety and flexibility of pyrotechnical blasting. Why not "Break with Convention" and explore the f

uture of rock breaking. The Royex rock breaking system

The Royex rock breaking system is designed to break rock where conventional explosives are either prohibited by regulation or unsuitable for the task. The Royex Generation II System is the world's first propellant based rock breaking system to be aligned with a sequential delay-timed initiation system
PyroDem Ltd provide the following services
•Site evaluation and blast feasibility
•Blast designs
•Onsite training (we strongly recommend a further 2 day training course after the basic course, this will ensure that the Royex system is utilised fully, saving you time and money)
•Blast supervision
•Post training consultation
•Drilling and blasting services
•Vibration monitoring

19/03/2022
24/01/2018

Royex, offering an alternative option when it comes to rock and concrete breaking. The Royex rock breaking system is designed to break rock/concrete where conventional explosives are either prohibited by regulation or unsuitable for the task. Royex offers a simple, safe and efficient option for blasters, miners and civil engineers alike, where the impact of ground vibration, noise, dust and fly-rock control inhibit the use of traditional blasting methods. The Royex Generation II System is the world's first propellant based rock breaking system to be aligned with a sequential delay-timed initiation system, the Maxfire Igniter. Today, no other propellant system can offer the versatility and functionality of the Royex Generation II System. Engineers, blasters, project managers and regulators face ever increasing challenges in controlling blast induced vibrations, air overpressure and other risks encountered in tunnelling, shaft sinking, trenching and surface rock breaking projects. Hanging wall damage, dilution and damage to support are costing stakeholders copious amounts of money every day. Explosives security, transport, storage and handling are increasingly topical issues. The new Royex Generation II rock breaking propellant system offers the most practical solution available anywhere. This non-detonating pyrotechnical cartridge is enhanced by the introduction of an innovative pyrotechnic initiation system offering timing functionality unique to the Royex system. Unlike any other system available the timing function is by means of a delay element encased within the individual igniter making it possible for each hole to be fired according to the required sequence. The introduction of this exclusive initiation system offers the capability to delay or time individual holes or sets of holes in a predetermined sequence to achieve co-ordinated blasting in almost any situation. The mechanics of the Royex cartridge are fundamentally different to conventional explosives. The product does not detonate and therefore does not generate any shock waves through the rock, allowing the rock to break naturally without stress. This smoother effect provides minimal crush zones and reduced vibrations resulting in an effect that can be employed to assure wall control, reduced dilution, dust control and general safety. The Royex Generation II system propellant mixture is finely oxygen balanced and generates negligible dangerous gases when initiated. Combined with conventional tunneling or mining ventilation, CO levels are below 5 ppm within a few minutes of blasting. These characteristics in partnership with the sequential timing offered by our unique initiation system provide the ability to achieve continuous operations in mining and tunneling applications. By comparison to conventional explosives, overall cost savings have been proven in mining and quarrying applications with the use of Royex systems. Improved safety, less stringent storage requirements, better fragmentation control and improved operational flows all contribute to overall cost reductions. The Royex System is 1.4S classified allowing the product to be transported and stored as a low explosive. Product sent to international destinations by air freight can generally be delivered within two weeks. In Europe and many other regions, the Royex system is classed as a pyrotechnic, (P2 class in the EU) which implies no necessity for its user to hold a conventional blasting licence. The P2 classification does not fall under the track and trace directive so restrictions associated with track and trace are avoided. The product does not function effectively unless placed in a drill hole, or confined, and as such is very safe to handle and store.

For further information, contact, PyroDem Ltd or Royex direct.

www.pyrodem.co.uk

www.royexsystem.com

Welcome to the Royex rock breaking system - The competitive alternative to conventional explosives and mechanical breaking in sensitive environments.

09/07/2017

The Royex system offers benefits such as large reduction of noxious gasses, negligible vibration, significant reduction in the amount of explosives used per meter blasted, as well as the simplicity of using the Maxclip system. These benefits makes the system perfect for continuous mining in narrow reef ore bodies, room and pillar mines as well as tunneling. Quicker re-entry times, no damage to hanging and side walls are all advantages traditional explosives cannot match. Additionally, by eliminating the crushed zone metal recoveries will be greatly enhanced for vein based metal extraction.

The crushed zone: When utilizing conventional explosives, a crush or melted zone of approx. 2x drill hole diameter is extended from the drill hole wall in hard rock. In coal this zone may be as large as 5x the drill hole diameter. All rock, metal and coal in this zone is completely pulverized thus lost. It has been proven in South African gold mines that eliminating crush zones in vein based metal extraction such as gold and platinum improves efficiencies thereby improving profits.

06/03/2016

Rock splitting

06/03/2016

Rock breaking with the same loading as in the safety video

06/03/2016

Safety Video

06/03/2016

Rock breaking close to plant

06/03/2016

Concrete breaking demo

Address

Auchterarder

Alerts

Be the first to know and let us send you an email when Pyrodem Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Pyrodem Ltd:

Share