πβ‘οΈπΏ From Bath to Shower β A 3-Day Transformation!
Out with the old bath and in with a new shower area! This project involved a few unexpected challenges along the way, but it all came together over three days.
π¨ Day 1 β Strip-out & preparation
The existing bath screen wasnβt coming away from the tiles easily, so careful tile cutting was needed to remove it and move the project forward.
With the bath out, I:
β
Prepared the plumbing and waste connections for the new shower tray
β
Cut the existing floor tiles to accommodate the tray and set it in place
β
Applied waterproof tanking to the walls
β
Planned the wall tile layout ready for installation
π§± Day 2 β Tiling & grouting
β
Fitted the wall tiles
β
Completed the grouting
β
Prepared fixing positions within the grout joints for the shower shelves
β¨ Day 3 β Installation & finishing
β
Installed the shower screen
β
Fitted the shower shelves
β
Completed the silicone sealing around the shower area
Take a look at the before-and-after photos to see the difference! πΈ