25/03/2025
Earthworks carried out in Matlock.
The raised area needed to be dropped by 3.5ft and prepared ready for another trade to carry out some works in the area.
18 tons of earth removed. Due to the layout of the garden and the steep terraces, all 18 tons had to be dug out by hand and carried to the top of the garden in buckets ready for the grab.