Barker & Son Construction

Barker & Son Construction πŸ”¨ Barker & Son Construction
πŸ—οΈ Extensions - Renovations - New Builds - Landscaping
πŸ”§ Steelwork Specialists
πŸ“Œ Hertfordshire, Bedfordshire & Buckinghamshire

Sheamus and Joe smashed it out with the plastering yesterday. The quality and speed is unmatched! πŸ”₯ Last night we got th...
17/02/2026

Sheamus and Joe smashed it out with the plastering yesterday. The quality and speed is unmatched! πŸ”₯

Last night we got the downlights in, we needed some good lighting to workπŸ’ͺ🏼

Got the utility area cleared out and shelves stripped out ready for the ceiling to come down this evening 😷

To round up the evening, I gave the old fella a present which you can see he’s absolutely chuffed with πŸ˜‚

Kitchen project gets plastered today! Then onto fixing some underfloor heating trays this evening πŸ’ͺ🏼Kitchen gets deliver...
14/02/2026

Kitchen project gets plastered today! Then onto fixing some underfloor heating trays this evening πŸ’ͺ🏼

Kitchen gets delivered next Tuesday! Need a big week to get this all ready βœ…

Thursday on site 🚧 We got the fascia and soffit fixed on the front dormer. This whole section is now ready for the roofe...
13/01/2026

Thursday on site 🚧

We got the fascia and soffit fixed on the front dormer. This whole section is now ready for the roofers

Mike has got the guttering installed around the house ready for the storm β›ˆοΈ

Today we are on building stud walls to make for a cleaner finish in the bathrooms πŸ’ͺ🏼

Kitchen ProjectTimber frame for the LED strip lighting has been constructed βœ… Central part of the ceiling has been insul...
16/12/2025

Kitchen Project

Timber frame for the LED strip lighting has been constructed βœ…

Central part of the ceiling has been insulated and plasterboarded using pink board for modern regs as there is a steel above βœ…

Old flooring stripped out. Insulated between joists and new 18mm ply has been fixed down which is the base for our underfloor heating system! - waiting on plumber to disconnect gas so we can complete.

Started breaking out old concrete slab = hard as f**k πŸ˜‚

The old man has been adapting some pipework in the hallway/downstairs toilet 🚻

The wiring had been temporarily replaced prior to starting. Although new sockets & lighting will be getting installed πŸ’‘

These evenings go quick. No time to waste 🚧

Plasterers have been hard at work which gets these rooms a step closer to finishing! Underfloor heating trays are due to...
15/12/2025

Plasterers have been hard at work which gets these rooms a step closer to finishing!

Underfloor heating trays are due to go down today on the top floor! Exciting times for this project.

Ground floor has come to a stop temporarily but we are confident it will be moving again soon πŸ’ͺ🏼

This house will be a beauty when its complete 🀩

Kitchen Project has officially started πŸ”₯ Can’t wait to see the end result on this after many hours of grafting πŸ‘€
11/12/2025

Kitchen Project has officially started πŸ”₯

Can’t wait to see the end result on this after many hours of grafting πŸ‘€

Front dormer being formed on our current project πŸͺ΅ this will look great once it’s complete! 🀩
08/12/2025

Front dormer being formed on our current project πŸͺ΅ this will look great once it’s complete! 🀩

Wednesday and Thursday on site 🚧Myself and the old man have been insulating and plasterboarding the second floor. This i...
05/12/2025

Wednesday and Thursday on site 🚧

Myself and the old man have been insulating and plasterboarding the second floor. This is a warm roof and we are trying to achieve between 150mm - 170mm thickeness with the insulation.

Between the rafters we have 150mm between, and 25mm overlay, and on the dormer walls we have 100mm between, and 50mm overlay. It never ends πŸ˜‚

Plasterboard we are using normal white board, however on the party wall we are using blue sound board.

The window fitters have been cracking on and have finished all windows and doors, except the mega bifold doors

Happy Friday πŸ₯³

Some missed photos βš”οΈThis project is a complete renovation where no part of the existing building remains the same. The ...
02/12/2025

Some missed photos βš”οΈ

This project is a complete renovation where no part of the existing building remains the same.

The most transformational part for me is the loft conversion πŸͺ΅ for this we have to strip the roof tiles, and start cutting out the old rafters, and also take out the existing joists, ready for all new, bigger, stronger timbers πŸ’ͺ🏼

We installed new steels in the first floor ceiling to carry the ceiling joists. This is needed to break the span of the joists.

Then we cut in the joists, and got to work on forming the roof 🏠

I feel I missed some of these important sections over previous posts, which is why I am going back to upload ⚑️