04/09/2026
Tight site. Tighter access. Still on programme.
We recently installed a hybrid structure for a private client in London on a genuinely constrained plot: limited space to store materials, restricted delivery windows, and neighbours on both sides.
That's exactly the kind of site where integrated design, manufacturing, logistics and installation delivers the full benefit of offsite construction.
Every delivery, right through to lifting the last SIPs (structural insulated panels) roof panel into place, was sequenced in advance, so the plan held up against the realities of an actual construction site.
Tight site, one accountable team, no surprises.
Working on a similarly constrained site? Get in touch and we'll talk through how we'd approach it.