30/10/2026
A job completed in the summer.
Just shy of 40m2 base dug out, raft foundation installed, with 10m3 of concrete pumped 70 metres.
Only access point was 800mm wide with multiple level drops , luckily our machines fit through a standard door width so this job was simple.