07/08/2026
Keynsham: Day 3
At least this one made progress. Waste pipes, Water feeds and armoured cables in the ground. However, our lovely client (not a pain in the ass at all!!) asked if we could put the necessary pipe work in for a hot tub. Not a problem for our team. Although she is defo a pain 😍