KPL Electrical Services

KPL Electrical Services Electrical Installations within the Commercial, Residential, Healthcare and Education Sectors

Brooklands College - Locke King Building - Phase 1 complete! New Lighting to the School Hall and Ground Floor Admin Offi...
06/04/2021

Brooklands College - Locke King Building - Phase 1 complete! New Lighting to the School Hall and Ground Floor Admin Offices, as well as new Small Power and Data to the new Reception Desk. Other than our works, it was great to see the Hall Flooring being refurbished. The old floor cane up really well! Currently working on Phase 2 - 2nd Floor, so watch this space for updates.

Brooklands College - Ashford Campus Hair and Beauty - Project completed back in January and what a transformation. End p...
06/04/2021

Brooklands College - Ashford Campus Hair and Beauty - Project completed back in January and what a transformation. End product looks amazing, the lads have done us proud once again! Well done to all those involved. First project for Brooklands and also for the Southern Division of our key client.

LSE Rosebery Hall - After 9 months away, without working on halls or campus, we are pleased to announce we are back! New...
15/03/2021

LSE Rosebery Hall - After 9 months away, without working on halls or campus, we are pleased to announce we are back! New main contractor, but same onsite team from KPL to see out levels 1-3. It's great to be able to finish off what we started, given we've worked on levels 4-9.

Baxter Road - Another project with temporary hoarding lights, installed back in December 2020 and as you can see the blo...
15/03/2021

Baxter Road - Another project with temporary hoarding lights, installed back in December 2020 and as you can see the block of flats is well underway, meaning we can commence 1st fix around the middle of April. Once again Electrical design has been carried out in house.

Manor Road - Temporary hoarding lights installed, for a new design and build residential project in Newham. The building...
15/03/2021

Manor Road - Temporary hoarding lights installed, for a new design and build residential project in Newham. The buildings are currently coming out of the ground and we hope to start on site, 1st fixing come the middle of April. Electrical design has been carried out in house.

BMI Mount Alvernia - St Clare Ward - 13 bedroom ward, completed October 2020. Great work carried out by our guys on site...
15/03/2021

BMI Mount Alvernia - St Clare Ward - 13 bedroom ward, completed October 2020. Great work carried out by our guys on site. It has been a pleasure working with the main contractor and all of the design team. Hopefully the first of many.

We would like to wish everyone a Merry Christmas and a much better 2021!
23/12/2020

We would like to wish everyone a Merry Christmas and a much better 2021!

Last week we completed the refurb of the Gamma Camera at The Royal Marsden NHS Foundation Trust - Chelsea. A bit more wo...
30/06/2020

Last week we completed the refurb of the Gamma Camera at The Royal Marsden NHS Foundation Trust - Chelsea. A bit more work than we first intended, having had to install the PDB, rewire the emergency stop buttons, and allow for cabling between the PDB and the Camera as requested by Siemens Healthineers. We also installed a new 100A Three Phase supply for the Gamma Camera from the local Switch Panel, replaced the lighting for LED Panels and carried out some small power alterations.

Two new vans have arrived, courtesy of Cars2vans.com Limited. Waiting to be loaded up and sign-written. Watch this space...
25/06/2020

Two new vans have arrived, courtesy of Cars2vans.com Limited. Waiting to be loaded up and sign-written. Watch this space!... With the addition of a pool van in the company, this should help when starting a new project but also clearing site upon completion.

Royal Marsden Hospital McElwain Building - Coming to the end of phase 1 of our first project at Royal Marsden, with phas...
22/06/2020

Royal Marsden Hospital McElwain Building - Coming to the end of phase 1 of our first project at Royal Marsden, with phase 2 (first floor) commencing in 2 weeks. Lighting manufactured by SG Lighting, Lighting Controls by CP Electronics, Schneider Electric distribution and panel boards, small power, mechanical supplies and fire detection. Access Control by ART Security Solutions Ltd.

LSE Rosebery Hall - Coming to the end of the current phase, meaning that across levels 3-7, a further 88no. bedrooms and...
22/06/2020

LSE Rosebery Hall - Coming to the end of the current phase, meaning that across levels 3-7, a further 88no. bedrooms and communal areas have been refurbished. Having been involved in levels 8 and 9, we've been on site since the summer of 2018. It's a shame that the next phases aren't progressing this year, but we hope to be back in 2021.

This week we've started another BMI Healthcare project at Clementine Churchill Hospital - new C.T Scanner Suite. PDB pro...
19/06/2020

This week we've started another BMI Healthcare project at Clementine Churchill Hospital - new C.T Scanner Suite. PDB provided by Hartley and Dark Electric, Switch board modifications by Carville Switchgear Ltd to upgrade existing switch to 200amp frame size, new cabling from this to feed the C.T Scanner, new lighting and small power to C.T Scanner Suite and also the control room. Electrical design carried out in house.