11/06/2026
🚨 Emergency Pump Station Repair Completed 🚨
ASAP Drainage were called to IBIS Hotel, Seven Kings to attend a failing pump station that was causing operational issues on site.
Our engineers attended with a vacuum tanker and removed approximately 15,000 litres of wastewater to gain safe access for inspection. Once the chamber was cleared, we a disconnected discharge pipe caused by excessive pressure within the system.
Using confined space entry procedures, our team safely entered the pump pit, reconnected and secured the pipework, and carried out full operational testing.
✅ Pump station repaired on site
✅ System tested and functioning correctly
✅ Site left operational before our engineers departed
Another successful emergency response by the ASAP Drainage team, minimizing disruption and restoring service quickly and safely.
📞 24/7 Emergency Drainage Services
🔧 Pump Stations | Drain Unblocking | Tankering | CCTV Surveys | Confined Space Entry
DrainageSolutions WastewaterManagement CommercialDrainage IBISHotel SevenKings DrainJetting VacuumTanker DrainageExperts LondonDrainage ReactiveMaintenance