Keith Millward Property Improvement & Maintenance

Keith Millward Property Improvement & Maintenance Jobs undertaken include kitchens, bathrooms, tiling, flooring, decorating at competitive prices.

Herringbone Tiling Job in 100mm x 200mm tiles
14/12/2023

Herringbone Tiling Job in 100mm x 200mm tiles

Bedroom, En-suite and dressing room projectRemoved fireplace, blocked hole and ran new electrics for socket and bed side...
14/12/2023

Bedroom, En-suite and dressing room project

Removed fireplace, blocked hole and ran new electrics for socket and bed side 2 way dimmer light switch. Had reskimmed.
Lifted old oak flooring and relevelled floor with self levelling compound.

Built stud wall for new en-suite, ran plumbing and electrics.
Fitted shower tray on 100mm raiser kit.
Finished shower walls with 10mm thick marble effect plastic sheets.
tiled en-suite floor with 600mm x 600mm black gloss tiles.
Fitted new towel rail.
Core drilled outer wall for soil pipe and connected to existing soil pipe from main bathroom.
Fitted space saving toilet/sink unit.

Removed existing dressing room, which was accessed by a door onto landing.
Cut a new doorway from bedroom and blocked up original doorway.
Removed old radiator, rerouted pipes for new radiator.
Fitted shelves, drawers and hanging rails.
Refitted doors, new architrave and skirting boards.
Redecorated throughout.
Fitted new LED downlights, sockets and switches.

Kitchen Project 2018Removed old kitchenRerouted plumbing and electricsCut out wall unit to accommodate soil pipe from ba...
13/12/2023

Kitchen Project 2018

Removed old kitchen
Rerouted plumbing and electrics
Cut out wall unit to accommodate soil pipe from bathroom above
Cut out wall unit to house boiler
Fitted rest of wall units and base units
Fitted work tops
Fitted oven, hob and sink
Fitted 10mm thick laminate wall panels
Fitted cooker hood and glass splash back
retiled floor

Boarding out the loft.Cut new hole in landing ceiling to reposition access for new loft ladder.Finished off new loft lad...
04/11/2023

Boarding out the loft.

Cut new hole in landing ceiling to reposition access for new loft ladder.
Finished off new loft ladder hatch with architrave.
Fitted and wired in LED strip lights.
Fitted stilts between joists 600mm spacing.
Fitted 2400mm x 600mm x 18mm tongue and groove boards cutting where necessary.
Fitted battens between roof braces, cut and fitted shelves.

A tricky kitchen project.Had to work the removal and refitting of this kitchen around it still being used by a young fam...
04/11/2023

A tricky kitchen project.

Had to work the removal and refitting of this kitchen around it still being used by a young family with a baby. Left old cooker and fridge in place as long as possible so they still had use before fitting new.

Rerouted electrics and plumbing in stages as old units removed new units fitted.
Fitted new integrated oven, bottle chiller and fridge freezer.
Cut and fitted worktops, hob and sink.
Sealed worktops with colour matching sanitary silicone.
Tiled floor in 600mm x 300mm grey tiles, grouted and cleaned.
All sockets and switches replaced (after photos taken).

Another bathroom projectRemoved old furniture.Replaced water damaged floor boards.Rerouted plumbing and electrics.Shower...
04/11/2023

Another bathroom project

Removed old furniture.
Replaced water damaged floor boards.
Rerouted plumbing and electrics.
Shower tray on 100mm raiser kit.
Fitted white plastic ceiling panels, downlights and fan.
Fitted plastic slate effect wall panels on 3 walls.
Fitted rest of furniture and mirror.
Fitted new radiator, bled and topped up central heating system
Sealed joints with colour matching sanitary silicone.

Client opted for vinyl flooring, fitted by other company.

Daughter Olivia's ensuit project.Constructed shelf to house drawers and plumbing for sink and concealed wc cistern.Rerou...
02/11/2023

Daughter Olivia's ensuit project.

Constructed shelf to house drawers and plumbing for sink and concealed wc cistern.
Rerouted plumbing and electrics.
Fitted shower tray on 100mm raiser kit.
Tiled floor with shimmer black 600mm x 600mm tiles.
Tiled walls with 600mm x 600mm grey marble tiles on most walls and blue marble tiles on feature wall.
Fitted white plastic ceiling, extractor fan and light fitting.
Fitted anthracite shelf and rest of furniture.
Sealed all joints with matching coloured sanitary silicone.
Fitted new radiator, topped up and bled central heating.

A small Herringbone tiling job. 50mm x 200mm tiles. New sockets and switches fitted.
02/11/2023

A small Herringbone tiling job. 50mm x 200mm tiles. New sockets and switches fitted.

Ensuit bathroom project.Knocked down partition wall between existing ensuit and dressing room which was no longer needed...
02/11/2023

Ensuit bathroom project.

Knocked down partition wall between existing ensuit and dressing room which was no longer needed.
Filled redundant dressing room doorway with studwork and plasterboard.
Built studwork frame to house shelves and shower valve/plumbing.
Covered studwork with insulated tile backer boards and sealed.
Fitted studwork to lower ceiling and plaster boarded.
Rerouted electrics for new downlights and ceiling fan and mirror.
rerouted plumbing and wastes for shower, wc, sink and bath.
fitted shower tray.
Rerouted plumbing for radiators.
Tiled floor 600mm x 600mm white marble tiles.
Tiled walls 1200mm x 600mm grey marble tiles
Tiled shelves, fitted mosaic tiles at rear and fitted low voltage downlights.
Fitted mosaic tiles behind wc position.
Grouted and cleaned all tiles.
Fitted white plastic ceiling and downlights.
Fitted and plumbed in rest of bathroom furniture.
Sealed all joints with matching coloured sanitary silicone.
Fitted and plumbed in radiators, topped up and bled central heating system.

Kitchen/dining room project.Removed old kitchen.Stripped floor tiles down to base concreteFitted insulation boards then ...
02/11/2023

Kitchen/dining room project.

Removed old kitchen.
Stripped floor tiles down to base concrete
Fitted insulation boards then underfloor heating elements.
Layed 800mm x 800mm floor tiles, grouted and cleaned.
Rerouted electrics for sockets and appliances.
Rerouted plumbing for sink and fridge.
fitted units, worktops, peninsular and appliances.
Fitted wall coverings (10mm thick laminate tech boards).
Final fix for sockets, lights and plumbing.

02/11/2023

Services include:

Kitchen fitting.
Bathroom fitting.
Room partitioning including preparation work for plastering including stud work and plasterboard fitting.
Floor and wall tiling.
Laminate flooring.
Electrical work (18th edition certified).
Plumbing.
Painting and decorating.
Window blinds and curtain rails.
Flat pack furniture assembly.
No job too big or too small.

02/11/2023

After 35 years in the electrical/maintenance industry, I decided to leave my full time job and offer my extensive skill set in property improvement and maintenance.

I pride myself in providing quality workmanship at a reasonable price and for being trustworthy and reliable. I always aim to complete work to the highest standard and I am willing to go out of my way to go the extra mile to do the job right.

I have built up a portfolio of my previous work and would be happy to provide references upon request.

Please call or message me to arrange a no obligation quote.

Address

Darwen
BB32JG

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 6pm

Telephone

+447757106957

Website

Alerts

Be the first to know and let us send you an email when Keith Millward Property Improvement & Maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Keith Millward Property Improvement & Maintenance:

Share