01/06/2026
🔥 another 3 bite the dust 🔥
As the first half of 2026 comes to a close we finished off with some smaller but just as important jobs being done “no job too small” 💪🏼 ⚓️
First was large sleeper/planters wrapped round this rear garden with deep drainage installed inside of the sleeper beds taking in the higher neighbouring gardens water which was causing this garden issues and distributing it round and away from the main grass area
Secondly we installed a new walk way using 900x600 pressed concrete paving and Cotswold buff gravel giving the front of the property a fresh lift and better access into the front door
Lastly French drains we installed 22m of French drains again taking away excess water and drying up this sodden grass area
We are now officially on our summer holiday 😎 ☀️ ✈️
Back with a bang in July ⚓️