Fleming Timber Structures

Fleming Timber Structures Experts in Timber Frame Engineering. Fleming Timber Structures have been providing exceptional timber frame buildings for over 59 years.

Our focus is always on our clients, being open and transparent in all we do.

We’re always updating our Projects page with our latest work across Fleming Timber Structures.One of our most recent add...
28/04/2026

We’re always updating our Projects page with our latest work across Fleming Timber Structures.

One of our most recent additions is Maybury, now featured within our case studies. The project was recognised for its excellence, winning Education Project of the Year at the 2025 Structural Timber Awards - a testament to the quality of design, collaboration and delivery.

Take a closer look at the project and explore more of our work here 🔗 flemingtimber.com/projects/

At Fleming Timber Structures, our strength lies in our people.Our teams across pre-construction, design and site operati...
23/04/2026

At Fleming Timber Structures, our strength lies in our people.

Our teams across pre-construction, design and site operations continue to evolve to meet the demands of modern construction - particularly in the drive towards Net Zero Carbon.

With dedicated Zero Carbon specialists and a strong focus on training, many of our operatives are now certified Passivhaus Tradespersons, demonstrating a high standard of competence in low-energy construction.

Learn more about our team and expertise here: https://www.flemingtimber.com/about-us/

At Fleming Timber Structures, we utilise engineered I-joists across a wide range of projects, supporting both floor and ...
21/04/2026

At Fleming Timber Structures, we utilise engineered I-joists across a wide range of projects, supporting both floor and roof applications.

Their strength, consistency and versatility make them an ideal solution for modern timber construction. Whether supplied as individual components or manufactured into prefabricated floor cassette panels in our factory, I-joists allow for a more efficient and controlled build process.

By delivering cassette systems that can be installed on site by crane, we’re also helping to reduce time on site and improve safety, minimising manual handling and working at height.

At Fleming Timber Structures, we support our clients at every stage of the journey - from early concept through to proje...
16/04/2026

At Fleming Timber Structures, we support our clients at every stage of the journey - from early concept through to project handover.

This approach is demonstrated on projects such as Maybury Primary School, recently recognised for its excellence, winning Education Project of the Year at the 2025 Structural Timber Awards.

Whether it’s a standard timber frame, glulam structure or Passivhaus project, our team provides technical guidance, cost advice and design expertise from the outset. Our in-house designers develop detailed technical drawings, enabling our factory to manufacture each timber kit to precise specifications.

Once on site, our experienced teams manage the delivery and er****on of the structure, ensuring quality at every stage, with final handover following a full inspection.

A joined-up approach that delivers certainty, efficiency and confidence from start to finish.

Fleming Timber Structures was pleased to deliver the structural timber package for the Kinmylies development in Invernes...
15/04/2026

Fleming Timber Structures was pleased to deliver the structural timber package for the Kinmylies development in Inverness, in collaboration with Morrison. 🚧

Our scope included the design, manufacture and er****on of the structural timber frame, comprising timber frame walls, roof cassettes and glulam beams. The project also involved the supply and installation of insulation and the internal VCL, providing a complete membrane-to-membrane package. 🪵

The images highlight key structural elements of the project, including timber frame wall installation with temporary propping, glulam beams supporting the roof structure, and moment-connected glulam beams and posts forming part of the building’s structural framework.

A great project to have been part of and an excellent example of modern timber construction in practice.

Fleming Timber Structures was pleased to deliver the structural timber package for Phase 2 of the Bluebell House develop...
15/04/2026

Fleming Timber Structures was pleased to deliver the structural timber package for Phase 2 of the Bluebell House development in Bannockburn, working alongside Hub East Central Scotland and Ogilvie Construction.

Our team supplied, manufactured and erected the structural timber frame and I-joist roof cassettes, forming the core structure for the new extension.

This second phase of the project will double the facility’s capacity to 48 pupils, supporting the continued growth of this important specialist education facility.

At Fleming Timber Structures, we deliver precision-engineered timber frame solutions that combine strength, durability a...
15/04/2026

At Fleming Timber Structures, we deliver precision-engineered timber frame solutions that combine strength, durability and efficiency.

Using factory-manufactured wall, floor and roof panels, we’re able to provide a more accurate, consistent and safer build process, while also reducing time on site. The lightweight nature of timber frame construction can also support more cost-effective foundations, without compromising on performance.

With a range of technologies available, we work closely with our clients to deliver the right engineered solution for every project.

28/03/2026

This Earth Hour, we’re reflecting on the role the construction industry must play in reaching net zero carbon. 🌎

At Fleming, sustainability is already embedded in how we operate. We have worked alongside Strathclyde university in developing our measurable and actionable carbon reduction plan with our net zero aims stated on SME Climate Hub Website.

We are working with clients to minimise embodied carbon in designs and approach and our low energy expertise in project delivery is reducing operational carbon through net zero, certified Passivhaus and other methodologies.

Earth Hour is a reminder that the built environment has a responsibility to be part of the solution.

The Thomas Graham Community Library was delivered as Scotland’s first community-owned public library 📚Fleming Timber Str...
19/03/2026

The Thomas Graham Community Library was delivered as Scotland’s first community-owned public library 📚

Fleming Timber Structures’ role centred on the design, manufacture and er****on of the glulam frame structure, incorporating glulam and structural timber elements to the walls and roof to form the main superstructure.

Read the case study here 🔗 https://www.flemingtimber.com/project/thomas-graham-community-library/

Throwback to the transformation of the Take A Bow Opportunity Centre in Kilmarnock 🎭Fleming Timber Structures was proud ...
11/03/2026

Throwback to the transformation of the Take A Bow Opportunity Centre in Kilmarnock 🎭

Fleming Timber Structures was proud to support the extension and refurbishment of this much-loved community space, delivered in collaboration with O’DonnellBrown and client Take A Bow Development Trust.

The project reimagined the existing 1970s building, creating a modern, energy-efficient facility tailored to the needs of the local community.

Swipe to see the finished project ➡️

A closer look at the Leamington Spa testing and research facility delivered during the Covid-19 pandemic.Designed to be ...
24/02/2026

A closer look at the Leamington Spa testing and research facility delivered during the Covid-19 pandemic.

Designed to be rapidly deployed, visually striking and fully demountable for future reuse, the structure was delivered under an exceptionally tight programme to support urgent national requirements.

Feedback like this from the project team reflects the collaboration and commitment that went into delivering a high-quality timber solution when it mattered most.

The race to achieve net zero buildings is accelerating, with reducing carbon emissions across the built environment a cr...
17/02/2026

The race to achieve net zero buildings is accelerating, with reducing carbon emissions across the built environment a critical focus.

At Fleming Timber Structures, we recognise the importance of considering a building’s whole life cycle, where material choice plays a key role in achieving long-term environmental benefits.

By specifying timber as the primary structural material, embodied carbon can be significantly reduced - in some cases by as much as 40%.

Address

23 Auchinloch Road, Lenzie
Glasgow
G665ET

Alerts

Be the first to know and let us send you an email when Fleming Timber Structures posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fleming Timber Structures:

Share