31/05/2026
A week after we have finished the blockwork on our West Kirby extension and our joinery team have completed the roof.
A double gable has been added to tie in with the size and design of the original roof whilst achieveing the necessary falls.
A structural steel beam has been added to the centre of the two gables to achieve the correct support as the room below the new roof is an open space.
Once our client has chosen the roof tile we will be stripping the entire roof to install a brand new roof across the entire home.