11/08/2024
Well that was a busy first week back after some Paternity Leave,
Two ultrasonic water flow meters with cloud data installed
A call out to 15 rooms in a hotel with no cooling due to a controls fault
A call out to check control wiring on a faulty chiller
4 EV charge points installed
Two emergency water shut off points installed within a hotel, to shut down the cold water booster set in the event of a leak
An emergency chiller installation from a phone call at 21:00, on site at 07:00 the next day to get them up and running.
An emergency re wire of a gym ahu which had no supply fans, all rectified and running late into the night just hours after the call.
We’re always happy to help our customers, if its planned works or emergency works. Give us a call if we can help in any way.
https://mbelectricalandcontrols.co.uk