31/08/2026
Malvern 📍
Kitchen/Diner refurb. Tacked all ceilings, timbered and fire lined around all steel casings. A lot of making good with bonding to level out all walls. Pre gritted dining room as it had shiny paint work prior to us coming. Completed with full plaster.
Finished to a high standard as always!
⭐️⭐️⭐️⭐️⭐️
Thanks to Dan dsrcarpentry_ for bringing us on board 🤜🏻