21/04/2026
Systemate 2000 removed and converted to a 250L unvented cylinder.
The central heating pump had failed and damaged part of the PCB that controls the heating.
The cost to replace these parts was too high to justify keeping this 20+ year old unit going.
250L unvented indirect cylinder and pipework conversion.
Floor strengthened and new base built to support cylinder.
Wiring centre fitted for new S plan set up, and controlled by a twin channel hive.