09/08/2025
Huge transformation in 6 days with this bathroom.
Customers had struggled with getting in and out of the bath so they thought it was time to renovate the bathroom making it much easier to get in and out of the shower with the controls being positioned on entry and exit of the shower.
Flooring is LVT with a lovely combination toilet and basin unit from Plumb World.
Perform Panels installed in the wet zone and behind the basin.