30/07/2026
Project update: two-level apartment renovation in central London 🏗️
The bathrooms are now fully prepared for tiling. Waterproofing is complete, underfloor heating has been installed, the floors have been levelled with self-levelling compound, and the walls are ready. Tiling starts next week.
At the same time, we’re waterproofing the terrace, while painting and decorating works are progressing throughout the apartment.
This week, we also completed the first fix for the air-conditioning system.
One of the most interesting solutions on this project is the use of water-cooled air-conditioning units without external condensers. This is a great option for period and Grade II listed buildings in central London, where external units can be heavily restricted, require additional consent, or sometimes be almost impossible to install.
A practical solution that provides modern comfort while respecting the building’s character and restrictions.
Step by step, the project is moving forward.