31/07/2025
Consumer Unit Upgrade Completed ⚡️
Today’s job was a full consumer unit replacement, following an electrical safety inspection that revealed a faulty RCD showing signs of thermal damage to the casing.
The outdated unit has now been upgraded to meet current regulations. The new installation includes:
✅ Individual RCBOs for better circuit protection
✅ Surge Protection Device (SPD) for added safety
✅ Arc Fault Detection Device (AFDD) for early fault detection
All tested and certified — another installation brought up to modern standards! 🔧💡