04/10/2026
Another pressure unit installation completed in York.
Kieran Shields and Andrew Shelley attended site to replace an existing pressure unit that had developed multiple failure points and was no longer providing the reliability required.
The old system was removed and replaced with a new Grundfos twin-pump, digitally controlled pressure unit, providing improved reliability, control and performance.
A tidy installation and another system brought up to date by the PressBoost engineering team.
Get in touch with us to discuss your boosted water requirements today.
We look forward to hearing from you.
✉️ [email protected]
📞 0161 798 5872
https://www.pressboost.co.uk/