04/09/2026
Burbage house renovation.
We have done,
Demos and alterations
Stud partitions
Plasterboarding
Installed new floor in the front extension 1st floor
new door linings
insulated ceilings and studs
Screeded front extension and side extension
Created more head space on the stairs
Cut through 3 new doorways
Blocked up 3 old doorways.
Drove a digger through the house
And created a new porcelain patio with a path to the annex.
🤙
Extensions and roof were completed before we started, we have done internal works only and the garden.