26/05/2026
ποΈ Project: Ironworks Lewisham
On site delivering cabling infrastructure between the BSB MSFD panel and 28 actuator locations, ensuring everything is set up correctly for final integration.
Scope includes:
β’ Individual cabling runs to each actuator location
β’ Installation of 2 core and 3 core 1.5mm screened LSZH flex cables
β’ Routing via primary containment with direct fixing where required
β’ IP-rated junction boxes installed at each actuator point
β’ All cables labelled at both ends and left ready for final connection
This stage is all about accuracy and preparation. Clean routing, proper labelling, and leaving the install ready for the next phase without confusion or rework.
Itβs not the final connection, but itβs what makes the final connection straightforward.
ποΈ Planning a new development or looking for a reliable contractor for your next project?
Learn more about our work on large-scale residential sites:
π www.allaboutav.co.uk
π Want to discuss specifications, site requirements or tender details?
Call: 0208 423 9224
Email: [email protected]
π Connect with our team:
Facebook: https://www.facebook.com/allaboutavgroup
Instagram: https://www.instagram.com/allaboutavgroup/
LinkedIn: https://www.linkedin.com/company/allaboutav/
TikTok: https://www.tiktok.com/
YouTube: https://www.youtube.com/