CPH Construction Ltd

CPH Construction Ltd CPH Construction Ltd have offered clients high standards of works for over 30 years. We are a groundworks and civil engineer contractor based in Dorset.

We carry out all aspects of domestic and commercial groundworks and have been trading since 1998.

Trench and duct works completed for SSE.All cables installed at 450mm depth. Also a 3 phase box mounted on the wall.Slab...
04/05/2026

Trench and duct works completed for SSE.

All cables installed at 450mm depth. Also a 3 phase box mounted on the wall.

Slabs lifted carefully and set aside ready for reinstatement.

Back on site after the jointers finish to reinstate and tidy up βš‘οΈπŸ‘

Little decking also completed today .... yes we do a variety of works ..πŸ™‚πŸ‘ŒRipped out the old rotten decking, built a bra...
14/04/2026

Little decking also completed today .... yes we do a variety of works ..πŸ™‚πŸ‘Œ

Ripped out the old rotten decking, built a brand new base, and re-decked the whole area. Solid, fresh, and ready to enjoy.

Perfect spot for those summer evenings and sundowners 🍻🍻 🌞

This one just finished had it all πŸ”₯Full dig out and prep, then 85mΒ² of Kandla Grey sandstone laid on a solid new base πŸ‘ŒI...
14/04/2026

This one just finished had it all πŸ”₯

Full dig out and prep, then 85mΒ² of Kandla Grey sandstone laid on a solid new base πŸ‘Œ

Installed new drainage with ACO channels to keep everything flowing right.

Finished off with a fresh set of steps to tie it all together.

From tired and worn out, to clean modern and built to last πŸ’ͺ

Fence fixed today few of these lately β€”post rotted and snapped. 6m of fresh feather edge up, with new Harris rails and a...
13/04/2026

Fence fixed today few of these lately β€”post rotted and snapped.

6m of fresh feather edge up, with new Harris rails and a solid 9ft post postcreted back in πŸ’ͺ

In and out

Great job, fellas πŸ‘

A few tidy tarmac patches completed at the BP garage today β€” and what a perfect day for it 🌞These areas had definitely s...
08/04/2026

A few tidy tarmac patches completed at the BP garage today β€” and what a perfect day for it 🌞

These areas had definitely seen better days, so we excavated down to 100mm, installed a solid 60mm base, and finished with a 40mm top layer to handle the heavy traffic moving through the site.

We also came across a pedestrian-rated lid right in the middle of the forecourt (never ideal in a high-traffic area). That’s now been replaced with a properly installed 40-tonne lid β€” much safer and built to last.

πŸ‘

A slightly different one for today β€” a fence that had seen better days after being a bit burnt πŸ”₯We made the most of what...
30/03/2026

A slightly different one for today β€” a fence that had seen better days after being a bit burnt πŸ”₯

We made the most of what was there: installed new posts, repaired and reused the existing feather edge, and finished it off with a brand new gate.

Great job by the team πŸŒžπŸ‘Œ

20/03/2026

This project was a bit run down and needed a fresh update. We hand-dug the entire area as access was too tight for machinery.

Installed a solid sub-base using 20mm to dust with a workable w**d membrane.

Laid Newstone Pearl porcelain slabs (600x600) to create a clean, modern patioβ€”perfect for your morning cup of tea 🌞 Finished with Carbon Easy Joint for a crisp look.

Completed the job with Black Ice chippings to form a stylish stepping stone effect down the side alley.

Quick. Clean. Modern. Low maintenance. 2 and a half days in and out πŸ™‚

Great work by the team πŸ‘

Another day another drop kerb .If your looking for a drop kerb we will deal with the application. Licence fees and compl...
03/03/2026

Another day another drop kerb .
If your looking for a drop kerb we will deal with the application. Licence fees and completion

Double drop kerb corners ... we love 'em! πŸ‘·β€β™‚οΈβœ… ... A Fantastic way to end the week. If you're in the BCP council area a...
20/02/2026

Double drop kerb corners ... we love 'em! πŸ‘·β€β™‚οΈβœ… ... A Fantastic way to end the week. If you're in the BCP council area and need a drop kerb, now's the time to act - prices are rising in April. Get in touch for a free quote and beat the price hike! πŸ™‚

06/02/2026

This one was something else β€” the front of the property was completely wasted space, so we opened it up and brought it back to life. 🀩

We dug out the entire driveway and installed a Mendip Type 1 sub-base with a permeable w**d membrane, then fully compacted it using a single drum roller and whacker plate.

All existing walls were removed and replaced with a new 4ft feather-edge fence. Along the rear of the drive, we installed a 6ft feather-edge fence with a new gate to provide privacy to the garden.

Brett Brindle Trio paving was laid around the perimeter of the drive to break up the black tarmac and add contrast. We also installed ACO drainage across the front of the drive, along with new path edgings to manage surface water effectively.

The job was finished with a fresh tarmac surface, creating enough space for three cars. Clean, tidy, and completely transformed.

We battled the weather all week but still turned it around in just one week. Really pleased with the end result β€” the lads worked hard and totally changed the whole perspective of the front of the house.

πŸ‘·β€β™‚οΈπŸ¦Ίβœ…

80 metres of trenching and duct installation completed using a mechanical excavator to facilitate the installation of a ...
06/02/2026

80 metres of trenching and duct installation completed using a mechanical excavator to facilitate the installation of a new lamp column over Chapel Gate for Bournemouth University.

The low-voltage (LV) trench was excavated to a consistent depth of 450mm. All works were carried out in accordance with approved Risk Assessments and Method Statements (RAMS), relevant specifications, and industry standards.

The works were completed safely and efficiently with due consideration given to existing services, site constraints, and the surrounding environment.

All re instated back to how it was before.

This phase of the project was delivered to a high standard by the site team.

πŸ‘·β€β™‚οΈπŸ¦Ίβš‘οΈβœ…

Address

Unit C10b, Admiralty Park
Poole
BH166HX

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+441202622209

Alerts

Be the first to know and let us send you an email when CPH Construction Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to CPH Construction Ltd:

Share