Insideout Building and Maintenance

Insideout Building and Maintenance Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Insideout Building and Maintenance, Contractor, Old Goonrawe farm, Redruth.

Recent kitchen installwidening of doorwaysReplacement window LVT flooring
28/06/2024

Recent kitchen install
widening of doorways
Replacement window
LVT flooring

If we could just have a week of dry weather we should be ready for felt and batten on the roof. 🌧🌧🌧
02/04/2023

If we could just have a week of dry weather we should be ready for felt and batten on the roof. 🌧🌧🌧

2.5 weeks, 13 m3 of concrete, 540 trench block and we are out of the ground 🙂
16/02/2023

2.5 weeks, 13 m3 of concrete, 540 trench block and we are out of the ground 🙂

That’s the second barn finished🙂
11/06/2022

That’s the second barn finished🙂

Barn conversion is coming on now!!
23/04/2022

Barn conversion is coming on now!!

Made a start on this barn conversion last week, removing the old concrete floor and the huge granite slabs we found unde...
09/12/2021

Made a start on this barn conversion last week, removing the old concrete floor and the huge granite slabs we found under it was a challenge but we got there in the end🙂

Nice little patio job last week, the weather was with us for a change!!
23/11/2021

Nice little patio job last week, the weather was with us for a change!!

Another job finished. We removed a wall on this one to create a much needed downstairs shower room from what was a cupbo...
11/11/2021

Another job finished. We removed a wall on this one to create a much needed downstairs shower room from what was a cupboard.

That’s another one finished (apart from handles and a plinth that have not arrived), one more to finish next week then o...
27/10/2021

That’s another one finished (apart from handles and a plinth that have not arrived), one more to finish next week then on to something different🙂

Cloakroom tiled and refitted this week, just a bit of decorating to finish it.
16/10/2021

Cloakroom tiled and refitted this week, just a bit of decorating to finish it.

Finished this bathroom today, first of four that we are currently working on.
08/10/2021

Finished this bathroom today, first of four that we are currently working on.

Recent Kitchen install in Portreath for MJR Group Sw Ltd
08/05/2021

Recent Kitchen install in Portreath for MJR Group Sw Ltd

Address

Old Goonrawe Farm
Redruth
TR164JD

Telephone

+447900364094

Website

Alerts

Be the first to know and let us send you an email when Insideout Building and Maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category