19/08/2026
***A new integrated energy approach powered by Biodiesel (B100) for UK construction***
Construction electrification depends on more than electric equipment. It depends on how generation, charging, connectivity and site operations work together.
KKB Green Power brings these elements together in one managed ecosystem—designed around complex site demands, equipment duty cycles, charging windows and changing load profiles.
Through its exclusive relationship with JS Power Limited, KKB Group combines OEM-warranted B100 generation with Rolec charging technology, Starlink-enabled connectivity, remote telemetry and intelligent information management.
The approach can support electric construction plant, site vehicles, welfare facilities, BESS units and wider temporary energy requirements where grid power is unavailable, delayed or insufficient.
Its significance lies in connecting lower-carbon generation with construction electrification: turning separate technologies into a coordinated, remotely visible and deployment-ready site-energy system.
KKB Green Power is working with clients, OEMs and project teams to explore where this approach can support live construction projects.
More info – see slides: https://lnkd.in/ee2z2JHe
To discuss a suitable project, contact KKB Green Power. [email protected]