25/05/2023
It’s been a busy month for Batten ⛏⛏
This job was for Wales & West utilities which involved laying a new 90m gas main to replace the old one.
The job consisted of saw cutting a 300mm wide trench, hammering out the tarmac then digging out the trench line. Once the trench was open the engineers worked on the existing line and started to lay new pipe. After the new pipe was in it was time to sand the trench and begin to backfill with foam concrete. The final 100mm was then tarmac’d to match the existing road 👍
The 2.7t kubota, 5.5t CAT and 3T JCB hydrostatic dumper worked perfectly 👌