13/10/2026
Immersion Into The Future..
A future proof Installation carried out recently on a lovely property in Kemberton.
A 50amp Sub main ran in from an existing metal clad consumer unit, for the supply of a loft consumer unit.
10mm twin&earth cabling clipped direct throughout the run.
2x New 16amp immersion circuits installed to 2x 20amp double pole isolation switches installed and labeled to coincide with unvented cylinder immersion positions.
This has future proofed the clients energy capabilities & capacity, with an existing oil fueled boiler in service currently, this new installation provides a back up and potential cost saving opportunity with rising fossil fuel energy costs now and in the future.
Surfs Up ππ€πΌππΌββοΈ