Carpentry.
LVT flooring laid to this reception area for a local dog rescue sanctuary.
22/05/2026
Plastering.
All done until the plumber does his bits.
20/05/2026
Plastering.
08/05/2026
Rendering.
OCR Render, base, mesh and top coat with a Tyrolean finish.
25/04/2026
Carpentry.
New concrete pre-fab shed flat roof put on.
I did the opposite pre-fab shed roof sometime last summer.
12/03/2026
Carpentry.
I finished off this kitchen for Newport housing association.
Lowered wall units to 450mm from worktop.
Fitted sink.
Fitted worktop splashbacks.
Fitted stainless steel splashback.
Fitted handles.
Fitted plinths.
Fitted RHS base unit filler up to the wall.
Fitted plastic cill.
Done all silicone.
15/02/2026
Plastering with a shine.
07/02/2026
Plastering.
MF ceiling installed then plasterboarded and plastered.