Evoke Design & Build

Evoke Design & Build We are a UK-based leading construction business with expertise to bring forth not only the best plan

The plastering stage at our Hinton Road project 🏗️ Walls and ceilings all skimmed to a smooth finish, rooms taking their...
18/08/2026

The plastering stage at our Hinton Road project 🏗️ Walls and ceilings all skimmed to a smooth finish, rooms taking their final shape and filling with light. Getting closer to that finished look every day. Follow along — the EVOKE way.
📍 Hinton Road, London

📍 Streatham High Road, London SW16Boarding and upper-floor stage now underway at our Streatham High Road project 🏗️ New ...
07/08/2026

📍 Streatham High Road, London SW16

Boarding and upper-floor stage now underway at our Streatham High Road project 🏗️
New timber floor joists, blockwork walls, a new staircase and stud partitions all going in as this South London building is transformed into brand-new flats.

Follow along as it comes together — the EVOKE way.



📍 Project Update | Earls Court, LondonWe're pleased to announce that works are now underway on our latest project in Ear...
05/08/2026

📍 Project Update | Earls Court, London

We're pleased to announce that works are now underway on our latest project in Earls Court, one of West London's most prominent locations.

Initial works have included:
✔ Site establishment and hoarding
✔ Safe access and logistics planning
✔ Preservation of existing architectural features
✔ Structural steel installation
✔ Careful preparation for the next construction phase

If you're considering a commercial refurbishment, structural alterations, office fit-out or design & build project anywhere in London, we'd be happy to discuss how we can help.

📍 Earls Court | Kensington | Chelsea | Fulham | South Kensington | West London

Building the bones at our Haydon's Road project in Wimbledon 🏗️Behind the retained front façade and side wall, it's a fu...
01/08/2026

Building the bones at our Haydon's Road project in Wimbledon 🏗️

Behind the retained front façade and side wall, it's a full new build — new timber roof structure, fresh floor joists and blockwork walls all going in. The dormers are framed and wrapped, ready to be made weathertight. Plenty more to come as this one takes shape.

📍 Haydon's Road, Wimbledon

28/07/2026

Streatham Project Update 🏗️ Metal-stud partitions, insulation and boarding going in at our Streatham High Road project — rooms taking shape floor by floor. A complex Lambeth build, done the EVOKE way.
📍 Streatham High Road, London

Latest from our Streatham High Road project in Lambeth 👇The floors are really taking shape now — partitions up so you ca...
27/07/2026

Latest from our Streatham High Road project in Lambeth 👇

The floors are really taking shape now — partitions up so you can see every flat, insulation packed into the walls, and the boarding going on ready for skimming. Edge protection's up around the stair void too, keeping everything safe on site.

Plenty more to come 👀
📍 Streatham High Road, Lambeth

24/07/2026

Step inside our Hinton Road project in Lambeth 👇
The flats are really coming together now — walls plastered, staircases in, kitchens fitted and bathrooms nearly there. Great to see the spaces take shape.
Plenty more to come 👀
📍 Hinton Road, Lambeth
📧 [email protected] · ☎️ 020 8167 7800

·

Step inside our Hinton Road project in Lambeth 👇The flats are really coming together now — walls plastered, staircases i...
22/07/2026

Step inside our Hinton Road project in Lambeth 👇
The flats are really coming together now — walls plastered, staircases in, kitchens fitted and bathrooms nearly there. Great to see the spaces take shape.
Plenty more to come 👀
📍 Hinton Road, Lambeth
📧 [email protected] · ☎ 020 8167 7800

· .

20/07/2026

Latest from our Hinton Road project in Lambeth..
We've had the whole building scaffolded and stripped right back to the structure. New steel's in, the roof's been fully rebuilt in fresh timber, and the new floors are down- and we've carefully restored the original mouldings by hand along the way.
Solid progress. Inside look coming next
Hinton Road, Lambeth

‘Equivalent’ isn’t always equivalent.One product change can quietly affect fire performance, thermal, acoustics, structu...
17/07/2026

‘Equivalent’ isn’t always equivalent.
One product change can quietly affect fire performance, thermal, acoustics, structure and warranties — even when it looks almost the same.
The problem usually isn’t the substitution itself.
It’s when it happens without a proper review, gets installed across multiple units, and leaves no clear record behind.
We’ve broken it down simply:
• Why one change creates multiple consequences
• Controlled change vs risky site swap
• How a small detail becomes a whole-development problem
• Why the paper trail matters
• What higher-risk buildings actually require
• The checks that should happen before anything gets approved
Swipe through before the next “it’s the same thing” conversation happens on site.
Save this one. You’ll need it.
What’s the most common material substitution request you get on your projects?

Address

Unit 6a, Kingfisher House, Restmor Way
Wallington
SM67AH

Opening Hours

Monday 9am - 11:59pm
Tuesday 12am - 6am
9am - 11:59pm
Wednesday 12am - 6am
9am - 11:59pm
Thursday 12am - 6am
9am - 11:59pm
Friday 12am - 6am
9am - 11:59pm
Saturday 12am - 6am
9am - 5pm

Telephone

+442081677800

Alerts

Be the first to know and let us send you an email when Evoke Design & Build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Featured

Share