12/03/2026
Check out this stunning bathroom renovation ๐
๐ Fully removed the existing suite, including all tiling and boxing, that was behind the sink and toilet to create a bigger bathroom.
๐ง First-fix plumbing includes:
A concealed shower valve with two outlets โ
๏ธ
Shower tray with new 40mm waste connection โ
๏ธ
Hot, cold & waste supplies for the basin vanity โ
๏ธ
Cold supplies alterations for the toilet โ
๏ธ
Flow & return supplies for a towel radiator โ
๏ธ
Hot, cold & waste supplies for a freestanding bath and a floor mounted bath tap โ
๏ธ
๐ All floor and wall tiling, including boxing and framework for the shower and niches, was completed to very high standards, as always with WXM Tiling&Bathrooms. ๐
๐ง Second-fix plumbing includes the following:
Shower controls and shower heads โ
๏ธ
Freestanding bath โ
๏ธ
Black floor mounted bath tap โ
๏ธ
Toilet and basin vanity unit โ
๏ธ
2x black shower glass panels โ
๏ธ
Black wall hung towel radiator โ
๏ธ
Silicone sealant around all sanitaryware โ
๏ธ
Feel free to drop us a message on Facebook Email on ๐๐
๐บ.๐ฝ๐ต๐ฏ@๐ด๐บ๐ฎ๐ถ๐น.๐ฐ๐ผ๐บ or WhatsApp๐ฑ Regarding any questions you have and for a ๐๐ฅ๐๐ ๐ค๐จ๐ข๐ง๐ on any job.๐ญ๐จ