MECC Hungary

Hívás Weboldal A vállalkozás elérése

MECC Hungary MECC Hungary is the professional Construction & Renovation Services company.

Big week at MOR 21.The formwork has come off the second-floor walls, and the new columns are standing with their starter...
05/10/2026

Big week at MOR 21.

The formwork has come off the second-floor walls, and the new columns are standing with their starter bars in position for the next slab. The site's tower crane is also now up and running.

The build is moving steadily toward the March 2027 handover. Apartments still available — [email protected] or +36 30 462 5080.

The structure at MOR 21 keeps climbing.Modular column formwork panels are up on the new slab, braced and squared ahead o...
02/10/2026

The structure at MOR 21 keeps climbing.

Modular column formwork panels are up on the new slab, braced and squared ahead of the next pour. Wall-formwork panels are already staged on deck, ready for the stage that follows — the site team is keeping the programme moving.

Interested in an apartment in Budapest District XIII? Reach us at [email protected].

Second floor slab poured at MOR 21.The concrete is down, column starter bars are standing, and formwork for the next flo...
29/09/2026

Second floor slab poured at MOR 21.

The concrete is down, column starter bars are standing, and formwork for the next floor's columns is already going up around the deck. The build is moving well, with handover scheduled for March 2027.

Apartments still available — get in touch at [email protected] or +36 30 462 5080.

Slab formwork going in at MOR 21, Budapest — September 2026.The team is setting up shutters and falsework for the next f...
26/09/2026

Slab formwork going in at MOR 21, Budapest — September 2026.

The team is setting up shutters and falsework for the next floor slab pour. A real site photo, not a render.

Project snapshot:

• 23-unit boutique residential building
• Civil construction: groundworks through to fit-out
• MEP integration managed in-house
• Completion: March 2027
• Delivery model: single contract, single point of responsibility

Build log live at m21apartments.com

Concrete poured at Nagy Fuvaros 25, our second residential build here in Budapest.The shuttered bay is cast and curing. ...
23/09/2026

Concrete poured at Nagy Fuvaros 25, our second residential build here in Budapest.

The shuttered bay is cast and curing. Civil construction is progressing to European standards and Western practices.

Build log: https://nf25apartments.com

08/10/2025
Mykonos Project NOW. - 30 rooms Apart Hotel MykonosProject started: March 1, 2025Expected Project Delivery Date: Novembe...
08/10/2025

Mykonos Project NOW.
- 30 rooms Apart Hotel Mykonos
Project started: March 1, 2025
Expected Project Delivery Date: November, 2025

Cím

Fay Utca 1/B
Budapest
1139

Nyitvatartási idő

Hétfő 09:00 - 19:00
Kedd 09:00 - 19:00
Szerda 09:00 - 19:00
Csütörtök 09:00 - 19:00
Péntek 09:00 - 19:00
Szombat 09:00 - 19:00

Telefonszám

+36304625080

Értesítések

Ha szeretnél elsőként tudomást szerezni MECC Hungary új bejegyzéseiről és akcióiról, kérjük, engedélyezd, hogy e-mailen keresztül értesítsünk. E-mail címed máshol nem kerül felhasználásra, valamint bármikor leiratkozhatsz levelezési listánkról.

A Vállalkozás Elérése

Üzenet küldése MECC Hungary számára:

Parancsikonok

Megosztás